| I'96 at Latson Road Interchange improvements | $4,800 |
| Reconfiguration of U.S. 31 from the Manistee Bascule Bridge to Lincoln Street in the City of Manistee | $600 |
| South Lyon, 2nd St. between Warren and Haggadorn | $100 |
| Provide a bypass around the Village of Almont during M'53 reconstruction which is contiguous with Macomb County | $80 |
| Construct improvements to Finkbeiner Road from Patterson Road to Whitneyville Road in Barry County, and new bridge over Thornapple River | $3,520 |
| Chippewa County, Upgrade Tilson Road between M'28 South to intersection of M'48 at Rudyard | $800 |
| Alpena County, Resurface 3.51 miles of Hamilton and Wessel Roads | $512 |
| Resurfacing of Stephenson Highway in Madison Heights | $280 |
| Widen Baldwin Road from Morgan to Waldon in Orion Township | $3,200 |
| Van Buren, Belleville Road widen to 5 lanes between Tyler and Ecorse | $880 |
| Houghton County, Gravel and paving of remaining 3.2 miles in 5.5 mile stretch of Jacobsville Rd | $344 |
| Construction and improvements to Western Avenue and associated streets between Third Street and Terrace Street in Muskegon | $2,320 |
| Highland, Clyde Road from Hickory Ridge to Strathcona | $100 |
| Alger County, Repaving a portion of H'58 from Buck Hill towards Little Beaver Road | $1,281 |
| Allen Road under the CN Railroad Grade Separation, Woodhaven | $3,560 |
| Construct Road Improvements to North Henry St. from Vermont Ave. to Wilder Rd. Bay City | $2,160 |
| Northwestern Highway Extension projects in Oakland County | $7,280 |
| Construct access road at intersection of Doerr Road and Schell Street to Develop 65-Acre of Municipal Tract of Industrial Land. Village of Cass City, Tuscola County | $21 |
| Design, Right-of-Way and Construction of the I'196 Chicago Drive (Baldwin Street) Interchange Modification, Michigan | $15,480 |
| Arenac County, Upgrade Maple Ridge Road from Briggs Road east to M'65 | $1,317 |
| Reconstruction of Leeman Road from County Road 581 west 7 miles to Lerza Road, Dickinson County | $1,200 |
| Iosco County, Reconstruct Bissonette Road from Lorenz Road to Chambers Road | $258 |
| M'6 Paul Henry Freeway trail design and construction | $2,224 |
| Delta County, CR 515 from U.S. 2 and U.S. 41 in Rapid River to County Road 446 at Days River Road-Bituminous overlay and joint repair | $256 |
| Cogshall Road Crossing Improvement and Life Safety Access Project in Holly, MI | $960 |
| Ontonagon County, Improve Fed. Forest Hwy 16 from M'38 to Houghton County Line | $400 |
| Reconstruction of 30th Avenue from 13th Street to 22nd Street, Menominee | $270 |
| Carpenter Road Reconstruction'700 feet South of Textile Road to I'94, Washtenaw County | $1,600 |
| Widen M'72 from U.S. 31 easterly 7.2 miles to Old M'72 | $2,000 |
| Wayne, Reconstruct one quarter of a mile stretch of Laurenwood | $100 |
| Widening of M'24 from two lanes to four lanes with a boulevard from I'69 to the county line | $800 |
| Resurfacing of Masonic Boulevard in Fraser. | $928 |
| Reconstruction of Nine Mile Road in Eastpointe | $896 |
| M-168 Reconstruction in the village of Elberta | $1,760 |
| Widen and reconstruct Tienken Road in Rochester Hills from Livernois to Sheldon. | $10,800 |
| Complete the 2 segments of U.S. 127 from Ithaca to St. Johns to a limited access freeway | $4,000 |
| Reconstruct and Widen I-94 in Kalamazoo, MI | $12,800 |
| Reduction from 3.5 miles of travel to 1.0 mile of travel crossing over the Tittabawassee River on Meridian Road. | $2,400 |
| Livonia, reconstruct Stark Rd. between Plymouth Rd. and I-96 | $800 |
| Baraga County, Reconstruction of county primary road on Bayshore Drive from Haanpaa Road northerly 1.7 miles to Whirligig Road | $600 |
| M-13 Washington Avenue Streetscape Project. Phase II of High Priority Project 192 in Public Law 105-550, City of Saginaw | $1,200 |
| Construct railroad grade separation on M-85 (Fort Street) North of Van Horn Road, Trenton. | $1,600 |
| Construct pedestrian trail and bridge in Kearsley Park in Flint. | $80 |
| Delta County, Widen, pulverize, improve drainage at County Rd. 497 from U.S. 2 at Nahma Junction southerly 4.75 miles to the village of Nahma. | $590 |
| Construction of Greenways in Pittsfield Charter Township--2.5 miles to existing Ann Arbor Greenways, Pittsfield Charter Township | $239 |
| I-96 Beck, Wixom Road Interchange, design, ROW, and construction | $2,400 |
| Construction of a hike and bike path from Riverbends Park, 22 Mile Road, to Stony Creek Park, 25 Mile Road in Shelby Township. | $400 |
| Gogebic County, Reconstruct Lake Road in Ironwood from Margaret Street to Airport Road | $644 |
| Construction of 5 lane concrete pavement with curb, gutter and sewer on Romeo Plank Road from M-59 to 23 Mile Road in Macomb Township | $8,000 |
| Plymouth, Haggerty Road from Plymouth Rd. to Schoolcraft Rd | $400 |
| Complete 13.8 miles of nonmotorized pedestrian Fred Meijer Heartland Trail of 30.1 miles. | $2,160 |
| Oscoda County, Reconstruction and surfacing of Valley Road from M-33 west to Mapes Road | $768 |
| Construct Interchange at I- 675 and M-13 (Washington Avenue). Northbound Exit. Phase I of Construction. City of Saginaw. | $2,000 |
| Construction of 5 lane concrete pavement with curb, gutter and storm sewer on Van Dyke Ave. from 23 Mile Road to 26 Mile Road, Macomb Co | $1,664 |
| Purchase and implementation of various Intelligent Transportation System technologies in the Grand Rapids metro region. | $9,944 |
| Menominee, Ogden Street Bridge rehabilitation project-replacement of deck, expansion joints, sidewalks, railing and all other joints | $160 |
| Conduct Feasibility Study to Extend I-475 to U.S. 23 in Genesee County. | $480 |
| Construction of Superior Road Roundabout, Superior Township | $600 |
| Construction of the I-696 and Northwestern Highway Interchange Freeway Ramps at Franklin Road in Southfield | $1,600 |
| Design and construction of West Michigan Regional Trail Network connector to link two trail systems together and to Grand Rapids | $2,400 |
| Construction of Nonmotorized Pathway, City of Rockwood. | $240 |
| Commerce, Haggerty Road from 14 Mile to Richardson | $1,200 |
| Sault Ste. Marie, Reconstruct East Spruce Street with drainage, curb, gutter, pavement, traffic control devices. | $760 |
| Study and construct I-96/ U.S. 31/Sternberg Road area improvements. | $2,000 |
| Construct Road Improvements to Miller Rd. from I-75 to Linden Rd. Flint Township. | $2,400 |
| Construct North Central Muskegon County Corridor Improvements at U.S. 31 and Russell Road | $1,840 |
| St. Clair County Parks is working with 13 local units to develop the 54- mile Bridge-to-Bay trail | $400 |
| City of Negaunee, Croix Street reconstruction- Streetscape and resurfacing from U.S. 41 to Maas Street | $900 |
| Integrated highway realignment and grade separations at Port Huron, MI to eliminate road blockages from NAFTA rail traffic. | $400 |
| Marquette County, Realignment of 3200 feet of County Road 492 from U.S. 41 north to County Road HD. | $400 |
| Houghton County, Rehabilitate 2 piers and remove old bridge caissons for Sturgeon River Bridge. | $216 |
| Westland, Ann Arbor Trail between Farmington and Merriman | $2,520 |
| White Lake and Commerce, pave Cooley Lake Road Between Ripple Way and Havenwood. | $400 |
| Garden City, Reconstruct Maplewood between Inkster and Merriman | $980 |
| Resurfacing of Ten Mile Road in St. Clair Shores | $717 |
| Reconstruct two bridges over Black Creek Drain in Sanilac County | $570 |
| Widen and reconstruct Walton Boulevard Bridge in Auburn Hills between Opdyke and Squirrel Road | $4,000 |
| Novi, Reconstruct Grand River between Novi and Haggerty | $800 |
| Construction of two railroad-highway grade separations on Farm Lane north of Mount Hope Road | $1,840 |
| Alcona County, Reconstruction of Ritchie Road from Village of Lincoln to Hubbard Lake road | $650 |
| Re-surfacing Sebewaing Road in Huron County. | $333 |
| Construct pedestrian and bicycle pathway at Chippewa Landing River Park in the Village of Caro | $64 |
| Reconstruct Third Ave. from Saginaw St. to Flint River, City of Flint | $2,400 |
| Reconstruct highway under a railroad bridge, Wyoming Ave. from Eagle Pass to Michigan Avenue, Wayne County | $800 |
| Repair M-10 corridor from I- 696 to downtown Detroit. | $800 |
| Planning and Engineering for The American Road, The Henry Ford Museum, Dearborn | $1,200 |
| Menominee County, County Road 557 Bridge Replacement over the Big Cedar River. | $224 |
| Montmorency County, Reconstruction of County Road 612 from W. County Line to County Road 491. | $640 |
| City of Menominee, Resurface Hattie Street Bridge deck 250 feet from 9th avenue in Menominee to Riverside Avenue in Marinette, WI. | $180 |
| Emmet County, Ultra thin demonstration project resurfacing of Mitchell Road from the City of Petoskey limits east to Division | $48 |
| U.S. 31 improvements and relocation between Holland and Grand Haven. | $7,200 |
| Ogemaw County, Overlay of Fairview Road to improve network of all-season truck routes | $296 |
| Monroe Area Highway-Railway Crossing Improvements, City of Monroe | $5,120 |
| Resurfacing of Frazho Road in Roseville | $1,024 |
| Otsego County, Resurfacing and widening of Parmater Rd | $294 |
| Study and implement transportation system alternatives in the vicinity of U.S. 31/M 46 | $2,800 |
| Study to determine replacement options for obsolete and structurally deteriorating bridge (Trenton-Grosse Isle Bridge) including approach roadways, Charter County of Wayne | $3,200 |
| Design, right-of-way and construction of passing relief lanes and improvements necessary on M-55, between M-37 and M- 115 | $1,760 |
| Construction of roads and trails Humbug Marsh Unit Linked Greenways System, Detroit International Wildlife Refuge. | $880 |
| Expansion of Cass Avenue in Clinton Township | $7,355 |
| Northville, Taft Road from 8 Mile North to city limits | $400 |
| Walled Lake, Widen Maple Road, west of Decker to Welch. | $100 |
| Construction of Pittsfield Greenways Bridge--Non- motorized bridge enhancement onto existing Bemis Road Bridge, Pittsfield Charter Township | $161 |
| Complete 58 miles of White Pine Trail from Grand Rapids to Cadillac | $2,240 |
| Carlysle Road Reconstruction, Inkster. | $2,000 |
| Replacement of the interchange at 44th Street and U.S. 131 in Grand Rapids | $7,200 |
| Jackson Freeway Modernization Project. I- 94 Modernization Project from Michigan State Route 60 [M60] easterly to Sargent Road | $12,800 |
| Study road runoff in Little Black Creek between U.S. 31 and Seaway Drive. | $320 |
| Eliminate major roadway on Cleary University campus and establish a new roadway. | $400 |
| Resurface Caseville Road in Huron County | $154 |
| Delta County, CR 186 from M- 35 at Brampton to U.S. 2 and U.S. 41--Bituminous overlay with super elevation, correction, curb, and gutter | $192 |
| Construct Industrial Park Service Road and Caine Road Bridge Replacement. Village of Millington, Tuscola County | $395 |
| Canton, Pave Cherry Hill Rd. between Canton Ctr., and Haggerty | $1,600 |
| Design, Right-of-Way and Construction of the I-196 Chicago Drive (Baldwin Street) Interchange Modification, Michigan | $2,400 |
| Widen and Reconstruct Walton Blvd. in Auburn Hills from Opdyke to Squirrel Rd. | $5,920 |
| East Grand River Improvements, Brighton Township, Michigan | $1,600 |
| Holmes Road Reconstruction-- From Prospect Road to Michigan Avenue, Charter Township of Ypsilanti. | $1,600 |
| Bristol Road improvement project from Interstate 69 to North Torrey road | $1,600 |
| Holland, Michigan, Construct River Avenue Corridor Improvements. | $2,320 |
| Plan and construct, land acquisition, Detroit West Riverfront Greenway. | $9,000 |
| Reconstruct and widen I-94 in Kalamazoo | $8,000 |
| Construct Interchange at I- 675 and M-13 (Washington Avenue), Northbound exit, in Saginaw | $8,000 |
| Rehabilitate bridge lift over Black River on 7th Street Bridge in Port Huron. | $5,000 |
| Reconstruct I-75 from North of U.S.-2 to Sault Ste. Marie and reconstruct the existing roadway, Sault Ste. Marie | $6,000 |
| Construct at-grade crossing and I-75 interchange to reconnect Milbocker and McCoy Roads and construct overpass to reconnect Van Tyle to South Wisconsin Road in Gaylord. | $5,000 |
| Improvements to Trowbridge Road Extension to Farm Lane, Ingham County, Farm Lane between Mount Hope Road and Trowbridge Road with underpasses for CN and CSX railroad crossings | $9,000 |
| Allen Road under the CN Railroad Grade Separation, Woodhaven. | $6,000 |
| Blue Water Bridge Plaza improvements and relocation of segments of I-94 and I-69. | $5,000 |
| West Portage Avenue realignment, Sault Ste. Marie. | $2,000 |
| Construct road improvements to Van Dyke Road, from I- 696 to Red Run Drain, City of Warren. | $8,000 |
| Construction of the I-696 and Northwestern Highway Interchange Freeway ramps at Franklin Road in Southfield | $3,000 |
| Construct road improvements to Miller Road from I-75 to Linden Road, Flint Township | $2,500 |
| University of Michigan Health Systems auto crash notification system. | $1,500 |
| Alger County, repaving a portion of H-58 between Sullivan Creek towards Little Beaver Road | $1,000 |
| Jackson Road Boulevard Extension, utilizing fly ash and recycled concrete in road surface. | $1,000 |
| Detroit Riverfront Conservancy, West Riverfront Walkway, Greenway and Adjacent Land Acquisition, from Riverfront Towers to Ambassador Bridge, Detroit | $20,000 |
| Reconstruct and widen I-94 in Kalamazoo | $20,000 |
| Construction of a new at-grade crossing and I-75 interchange to reconnect Milbocker and McCoy Roads and a new overpass to reconnect Van Tyle to South Wisconsin Road in Gaylord | $7,000 |
| The Trowbridge Road Extension to Farm Lane, Ingham County, MI, Farm Lane between Mount Hope Road and Trowbridge Road with underpasses for CN and CSX railroad crossings | $6,000 |
| East Riverfront, completion of Detroit Riverfront East Walkway, Detroit | $3,000 |
| Alger County, Repaving a portion of H-58 between Sullivan Creek towards Little Beaver Road | $11,000 |
| Jackson Road Boulevard Project, Scio Township | $5,000 |
| Blue Water Bridge Plaza Expansion, Improve Highway connections along I-94 and I-69 Port Huron | $18,000 |
| Midtown Detroit Greenway Loop, Detroit Cultural Center in Detroit | $2,000 |
| Pinnacle Aeropark Access Project in Wayne County | $2,000 |
| Washington Ave. Streetscape and rail relocation in Saginaw | $1,000 |
| U.S. 131 widening from the Manistee River to north of M-113 in Grand Traverse County | $3,000 |
| 11 Mile Road Reconstruction--Berkley, Huntington Woods, Oak Park | $2,000 |
| Planning, design, and construction of a new American border plaza at the Blue Water Bridge in or near Port Huron, MI | $20,000 |
| "Port Huron, Michigan, Blue Water Area Transportation Commission, Bus Maintenance Facility " | $5,500 |
| "Lansing, MI, Capital Area Transportation Authority, Bus Replacement and Bus Related ITS" | $3,600 |
| "Detroit, MI Bus Replacement" | $6,270 |
| "Detroit, MI Enclosed heavy-duty maintenance facility with full operational functions for up to 300 buses" | $3,762 |
| Detroit Bus Maintenance Facility | $7,524 |
| Detroit Department of Transportation Bus Replacement | $8,600 |
| Detroit Fare Collection System | $3,344 |
| Detroit Replacement Buses | $4,180 |
| "Grand Rapids, Michigan, The Rapid, Bus Replacement " | $5,200 |
| "Grand Rapids, MI-Purchase replacement and expansion buses " | $12,247 |
| "City of Kalamazoo, MI bus Replacement " | $7,200 |
| "Barry County, MI-Barry County Transit equipments and dispatching software " | $125 |
| "Eastern Upper Peninsula, MI Ferry Dock and Facility upgrades for Drummond Island Ferry Services " | $209 |
| "Ionia County, MI-Purchase and Implementation of communication equipment improvements" | $493 |
| "Marquette County, Michigan Transit Authority Bus passenger facility " | $1,200 |
| Michigan Department of Transportation (MDOT) Bus Replacement | $9,200 |
| "Flint, MI, Mass Transportation Authority Bus Maintenance Facility " | $2,000 |
| "Muskegon, Michigan-Muskegon Area Transit Terminal and related improvements" | $1,672 |
| Boysville fo Michigan Transportation System | $2,809 |
| Suburban Mobility Authority for Regional Transportation (SMART) Bus Maintenance Facility | $7,500 |