| Replacement of Cross Street Bridge spanning flood prone Aberjona River, Winchester | $800 |
| Reconstruction of Massachusetts Avenue including safety improvements and related pedestrian, bike way in Arlington | $1,600 |
| Construct access roads to Hospital Hill project in Northampton, MA | $1,600 |
| Reconstruct Route 24/Route 140 Interchange, replace bridge and ramps, widen and extend acceleration and deceleration lanes | $13,000 |
| State Street Corridor Redevelopment Project includes street resurfacing, pedestrian walkway improvements and ornate lighting from Main Street to St. Michael's Cemetery, Springfield | $4,800 |
| Massachusetts Avenue Reconstruction, Boston | $3,850 |
| Rehabilitation of I'95 Whittier Bridge'Amesbury and Newburyport | $1,600 |
| Realignments and reconstruction of a section of Route 32 in Palmer to the Ware town line | $2,560 |
| Somerville Roadway Improvements | $2,300 |
| Assabet River National Wildlife Refuge, MA, Design and Construction of parking areas | $420 |
| Study and analysis of Lowell Westford St.-Wood St. Rourke Bridge Corridor, Lowell | $500 |
| Design and construct the 1.5 mile East Longmeadow Redstone rail Trail bike path | $1,200 |
| Downtown revitalization for Pleasant Street, Malden | $1,520 |
| Construct new interchange on I'95 between existing Route 1A ramp to the north and Route 123 ramp to the south, Attleboro | $500 |
| Commonwealth Ave/Kenmore Sq. roadway and pedestrian improvements | $4,000 |
| Improve traffic signal operations, pavement markings and regulatory signage, Milton-Boston City Line | $1,200 |
| Melnea Cass Blvd. Reconstruction | $2,160 |
| Pedestrian Walkway for the Town of Norwood | $780 |
| Study and design I'93/Mystic Ave. Interchange at Assembly Sq | $400 |
| Conduct design, feasibility and environmental impact studies of proposal to relocate New Bedford/Fairhaven bridge | $1,400 |
| Design and construct intersection improvements at Memorial Park II on Roosevelt Ave. from Bay St. to Page Boulevard, Springfield | $800 |
| Design, engineer, permit, and construct ''Border to Boston Bikeway'' rails-trails project, from Salisbury to Danvers | $800 |
| Design and construction of the north and southbound ramps on Interstate 91 at Exit 19 | $1,200 |
| Longwood Ave/Urban Ring Tunnel Study | $450 |
| Construction of East Milton Parking Deck over Interstate/Rt. 93. | $1,000 |
| Design, engineering, and construction at I-93 The Junction Interchange, Andover, Tewksbury and Wilmington | $2,200 |
| Infrastructure Improvements in the Gardner-Kilby- Hammond Area, Worcester. | $600 |
| Reconstruction of Goddard Memorial Drive from State Route 9 to Airport Drive, Worcester. | $900 |
| Union Square Roadway and Streetscape Improvements | $400 |
| Route 116 and Bay Road Intersection Improvements- Amherst. | $3,200 |
| Design and Build Cape Cod Bike Trail, with Shining Sea Bikeway, to link core with outer Cape communities and heavily visited national sites | $3,200 |
| Design and construct Canal and Union Street Corridor improvements, Lawrence | $800 |
| Route 128 Improvements-- Route 114 in Peabody to Route 62 in Danvers. | $1,600 |
| Reconstruction of Main Street and Lebanon Street in Melrose | $560 |
| Southwick and Westfield Rail Trail, Design and Construction | $4,000 |
| Construct and Replace West Corner Bridge and Culvert, Rt. 228, spanning Weir River Estuary and Straits Pond Inlet | $800 |
| Acquisition, engineering, design, and construction of the Assabet River Rail Trail, Acton, Hudson, Maynard, and Stow. | $1,500 |
| Hampshire County Bike Paths, Design and Construction | $4,400 |
| North Worcester County Bike Paths, Design and Construction | $4,000 |
| Design and construct signal crossing and other safety improvements to Emerald Necklace Greenway Bicycle Trail, Town of Brookline | $600 |
| Reconstruction of Pleasant Street, Watertown. | $1,600 |
| Geometric improvements, safety enhancements and signal upgrades at Rt. 28 and Rt. 106, intersection West Bridgewater | $1,200 |
| Streestcape and pedestrian access improvements between Museum Road and Forsyth Way. | $3,200 |
| Gainsborough St. and St. Botolph St. Improvements | $900 |
| East Boston Haul Road Construction | $5,000 |
| Warren Street--Blue Hill Avenue | $2,400 |
| Design and construct the Quinebaug River Rail Trail Bikeway. | $800 |
| Construct the Blackstone River Bikeway and Worcester Bikeway Pavilion between Providence, RI and Worcester, MA. | $1,600 |
| Engineering and construction of Blackstone Valley Visitors Center at intersection of State Route 146 and Millbury Street, Worcester. | $6,400 |
| Rt. 128/95 ramp Northbound to Kendrick Street, Needham. | $1,400 |
| Washington St. from High St. to Water St., Walpole. | $1,400 |
| Design, engineering, and construction of Methuen Rotary alternative at I-93 and Routes 110 and 113, Methuen. | $600 |
| Design and construct the 3- mile long Grand Trunk Trail bikeway from Sturbridge to Southbridge. | $560 |
| Northern Avenue Bridge rehabilitation, Boston | $2,400 |
| Relocate Rt. 79 in Fall River to create 4-lane urban boulevard with landscaped median and developable waterfront | $1,800 |
| Design and Construct Blackstone River Bikeway and Worcester Bikeway Pavilion between Providence, RI and Worcester. | $2,000 |
| Reconstruct North Washington Street Bridge to connect Boston and Charlestown. | $4,000 |
| Chelsea Street Bridge Reconstruction | $9,000 |
| Improvements to Mass. Ave, Andover Street, Osgood Street, Salem Street, and Johnson Street in the Old Town Center of North Andover. | $800 |
| Somerville Bicycle Path Improvements--Cedar Street to Central Street. | $900 |
| Massachusetts Bay Transportation Authority Secure Station, Boston | $1,000 |
| Crosby Drive Improvement Project. | $800 |
| Canalside Rail Trail Construction of the Canalside Rail Trail, Deerfield and Montague | $800 |
| Berkshire County Bike Paths, Design and Construction | $4,000 |
| Oxbow National Wildlife Refuge, Design and construction of a Visitor Contact Station. | $1,500 |
| Rehabilitation and paving of Parker River Road | $200 |
| Longfellow Bridge Rehabilitation | $3,000 |
| Reconstruction of Union St. and Rt. 138W, Holbrook | $1,220 |
| Public Improvements to Springfield Symphony Hall. | $240 |
| Charlemont Bridge, Route 2, Charlemont | $3,840 |
| Cambridge Bicycle Path Improvements | $1,000 |
| Chelsea Roadway Improvements | $2,000 |
| Reconstruction of the I-95/ Rt. 20 Interchange in Waltham. | $1,040 |
| Rutherford Avenue Improvements, Boston | $1,000 |
| Reconstruct Chelsea Street Bridge in Boston | $6,000 |
| Design and construct downtown roadway and streetscape enhancements in Worcester | $4,500 |
| Design and construct Rt. 24 Interchange in Fall River and Freetown | $5,500 |
| Design and construct multimodal improvements and facilities in New Bedford. | $5,500 |
| Construct access improvements to the Lawrence Gateway Project, Lawrence | $2,500 |
| Construct pedestrian and vehicular access improvements on the existing Brightman Street Bridge in Fall River | $500 |
| Northern Avenue Bridge rehabilitation in Boston | $6,000 |
| Construct Phase II of the Quincy Center Concourse Extension in Quincy. | $6,000 |
| Design and construct downtown roadway and streetscape improvements in North Adams | $2,000 |
| Construct Holyoke Canalwalk and streetscape improvements in Holyoke. | $3,500 |
| Road improvements between Museum Road and Forsyth Way in Boston. | $3,000 |
| Design and construct access improvements and intermodal facilities at the former South Weymouth Naval Air Station in South Weymouth | $8,000 |
| Design and construct Boston National Park traveler information system and visitor center in Boston | $7,000 |
| Construct Haverhill intermodal center access and vehicle capacity improvements in Haverhill. | $3,000 |
| Design and construct roadway and streetscape improvements in Franklin | $5,000 |
| Construct Lechmere Station area roadway and access improvements in Cambridge. | $5,000 |
| Design and construct Assembly Square multimodal access improvements in Somerville | $5,000 |
| Construct downtown roadway and corridor improvements in Gloucester. | $3,000 |
| Construct the Blackstone River Bikeway and Worcester Bikeway Pavilion between Providence, RI and Worcester. | $2,000 |
| Construct Melnea Cass Corridor improvements in Boston | $4,000 |
| Construct Southeastern Massachusetts freight rail corridor improvements in Bristol County | $5,000 |
| Reconstruct Rt. 24/Rt. 140 Interchange, replace bridge and ramps, widen and extend acceleration and deceleration lanes | $4,000 |
| Design and construct Rt. 20 access road in Westfield | $2,000 |
| Reconfigure Kilby-Gardner- Hammond area road network in Worcester | $2,000 |
| Construct rail freight corridor improvements between Boston and Worcester | $9,000 |
| Design and construct bicycle and pedestrian trails in Barnstable County | $3,000 |
| Rutherford Avenue Improvements in Boston | $9,000 |
| Design and construct roadway and streetscape improvements along State Street in Springfield | $5,000 |
| Construct I-91 Corridor Intelligent Transportation System Communications Network, Hampden, Hampshire, and Franklin Counties | $4,000 |
| Design and construct roadway and streetscape improvements along Main Street and Maywood Street, Worcester, MA | $2,000 |
| Design and construct downtown roadway and streetscape improvements in Brockton | $2,000 |
| Design, engineering, and construction at I-93 The Junction Interchange, Andover, Tewksbury, and Wilmington | $4,000 |
| Gainsborough St. and St. Botolph Street Improvements in Boston | $2,000 |
| "Brockton, MA Bus replacement for the Brockton Area Transit Authority" | $1,254 |
| "Framingham, MA Local Intra-Framingham Transit System enhancements " | $1,505 |
| "Lowell, MA Implementation of LRTA bus replacement plan" | $836 |
| "Lowell, MA, Lowell Regional Transit" | $3,450 |
| "Attleboro, MA Construction, engineering and site improvements at the Attleboro Intermodal Center " | $1,672 |
| "Berkshire, MA, Berkshire Regional Transit Authority Bus Maintenance Facility " | $100 |
| "Beverly, MA Design and Contruct Beverly Deport Intermodal Transportation Center" | $1,672 |
| "Boston, MA Harbor Park Pavilion & Inter-modal Station " | $1,045 |
| "Haverhill, MA Design and Construct Inter-modal Transit Parking Improvements" | $4,682 |
| "Hingham, MA Higham Marine Intermodal Center Improvements: Enchance public transportation infrasturcture/parking" | $7,524 |
| "Lawrence, MA, Gateway Intermodal and Quadant Area Reuse Project" | $3,450 |
| "Medford, MA Downtown revitalization featuring construction of a 200 space Park and Ride Facility" | $1,672 |
| "Newburyport, MA Design and Construct Intermodal Facility" | $1,672 |
| "Quincy, MA MBTA Purchase high speed catamaran ferry for Quincy Harbor Express Service " | $1,672 |
| "Revere, MA Inter-modal transit improvements in the Wonderland station (MBTA) area" | $1,505 |
| "Rockport, MA Rockport Commuter Rail Station Improvements" | $2,299 |
| "Salem, MA Design and Construct Salem Intermodal Transportation Center" | $1,672 |
| "Woburn, MA Construction of an 89 space park and ride facility to be located on Magazine Hill, in the Heart of Woburn Square " | $1,505 |