| Reconstruct Wisconsin State Highway 21 at I'94 interchange | $2,400 |
| Develop pedestrian and bike connections that link to Hank Aaron State Trail in Milwaukee | $1,680 |
| Reconstruct U.S. Highway 41'STH 67 interchange (Dodge County, Wisconsin) | $1,000 |
| City of Glendale, WI. Develop and rehabilitate exit ramps on I'43, and improvements at West Silver Spring Drive and North Port Washington Rd | $2,400 |
| Resurface U.S. 8 between CTH C and Monico | $880 |
| Expand U.S. 41 between Oconto and Peshtigo, Wisconsin (Oconto and Marinette Counties, Wisconsin) | $1,600 |
| Improve Superior Avenue: Interstate 43 to State Highway 32, Sheboygan County, Wisconsin | $1,000 |
| Reconstruct U.S. 45 in Antigo | $1,616 |
| Preliminary engineering for upgrading I'94 between Illinois State Line and Mitchell Interchange in SE Wisconsin | $7,200 |
| Construct a bicycle/pedestrian path, City of Portage | $1,760 |
| Replace Wisconsin Street Bridge (STH 44) in Oshkosh, Wisconsin | $10,000 |
| Reconstruct and rebuild St. Croix River Crossing, connecting Wisconsin State Highway 64 in Houlton, Wisconsin to Minnesota State Highway 36 in Stillwater, Minnesota | $5,600 |
| Construct SH 32 (Claude Allouez) bridge in DePere, Wisconsin (Brown County, Wisconsin) | $400 |
| Construct an alternative connection to divert local traffic from I'90, a major highway, and allow movement through the Gateway commercial development project | $3,200 |
| Construct traffic mitigation signals, signs, and other upgrades for Howard Ave, St. Francis | $320 |
| Reconstruct SH 181 between Florist Ave. and North Milwaukee County Line | $3,600 |
| Pioneer Road Rail Grade Separation (Fond du Lac, Wisconsin) | $5,000 |
| Reroute State Hwy 11 near Burlington, WI (Walworth and Racine Counties, WI) | $3,200 |
| Widen Wisconsin State Highway 64 between Houlton and New Richmond | $3,200 |
| Rehabilitate Highway 53 between Chippewa Falls and New Auburn | $3,200 |
| Rehabilitate existing bridge and construct new bridge on Michigan Street in Sturgeon Bay, Wisconsin | $5,600 |
| Expand Highway 10 between Marshfield and Stevens Point. | $16,000 |
| Expand U.S. 45 between CTH G and Winchester, Winnebago County, WI | $4,000 |
| Expand U.S. 141 between SH 22 and SH 64 (Oconto and Marinette Counties, Wisconsin) | $1,600 |
| Replace 17th Street Lift Bridge, Two Rivers, Wisconsin. | $6,000 |
| Construct bicycle/ pedestrian path and facilities in the Central park area of Madison | $2,800 |
| Reconstruct U.S. Highway 41 north of Lake Butte des Morts Bridge, Wisconsin. | $13,000 |
| Construct a bicycle/ pedestrian path, Wisconsin Dells. | $1,600 |
| Recondition U.S. 45 between New London and Clintonville, Wisconsin (Waupaca County, Wisconsin) | $1,600 |
| Upgrade U.S. 41 from DePere to Suamico, Wisconsin (Brown County, Wisconsin). | $2,000 |
| Construct Lake Butte des Morts Bridge, U.S. Highway 41, Winnebago County, Wisconsin. | $28,000 |
| Upgrade U.S. 2 in Ashland County | $3,200 |
| Expand U.S. 51 and SH 29 in Marathon County. | $6,400 |
| Construct U.S. 151 between CTH D and SH 175, Fond du Lac County, WI | $3,000 |
| Expand SH 23, County Highway OJ to U.S. Highway 41, WI | $24,000 |
| North 28th Street Phase 2 roadway safety improvements from Weeks Avenue to Hill Avenue in Superior | $1,024 |
| Construct a bike and pedestrian bridge across SH 100 at the 1800 block of S. 108th Street, West Allis. | $240 |
| Realign U.S. 8 near Cameron, Barron County | $1,600 |
| Build additional staircases, landscape, and other improvements to the marsupial bridge at the Holton St. Viaduct in Milwaukee. | $640 |
| Recondition SH 16 from Columbus to SH 26 (Dodge County, Wisconsin) | $4,000 |
| Expand U.S. 151 between Dickeyville and Belmont. | $1,600 |
| Construct a bicycle/ pedestrian path from Waunakee to Westport | $1,600 |
| Enhance West Silver Spring Ave. with lighting enhancement, crosswalk improvements, sign-age, landscaping, Milwaukee | $320 |
| Construct North Shore Extension of Friendship State Trail, Calumet and Winnebago Counties, Wisconsin. | $350 |
| Construct a bicycle/ pedestrian path, and two bridges across Starkweather Creek, Madison. | $1,600 |
| Rehabilitate Highway 51 between CTH S and U.S. 8 in Lincoln County. | $1,600 |
| Upgrade I-43 between State Highway 140 and East County Line in Rock County, Wisconsin. | $2,400 |
| Implementation of recommendations contained in 2005 Safe Routes to School in Superior plan. | $480 |
| Complete the Glacial Drumlin Trail, from Madison to Waukesha. | $240 |
| Reconstruct Interstate 94/ 43/794 (Marquette Interchange) in Milwaukee. | $20,800 |
| Rehabilitate existing bridge and construct new bridge on Michigan Street in Sturgeon Bay. | $7,500 |
| Reconstruct and rebuild St. Croix River Crossing, connecting Wisconsin State Highway 64 in Houlton, Wisconsin to Minnesota State Highway in Stillwater, Minnesota. | $7,500 |
| Reconstruct U.S. Highway 151 (East Washington Ave.) in Madison | $4,000 |
| Expand SH 57 between Dyckesville and Sturgeon Bay. | $3,000 |
| Rehabilitate Highway 53 between Chippewa Falls and New Auburn | $2,000 |
| Expand U.S. Highway 151 between Dickeyville and Belmont. | $2,500 |
| Develop pedestrian and bike connections that link to Hank Aaron State Trail in Milwaukee. | $400 |
| Reconstruct SH 78 between Prairie du Sac and Merrimac, WI, including reuse of rubble from Badger Ammunition Plant building demolition. | $500 |
| Upgrade Interstate 94 between Wilson Creek and Red Cedar River in Dunn County | $2,000 |
| City of Glendale, WI. Develop and rehabilitate exit ramps on I-43, and improvements at West Silver Spring Drive and North Port Washington Rd | $2,000 |
| Expand U.S. 51 and SH 29 in Marathon County. | $2,500 |
| Upgrade U.S. 2 in Ashland County | $2,100 |
| Widen Wisconsin State Highway 64 between Houlton and New Richmond | $1,500 |
| Upgrade U.S. 41 from DePere to Suamico, Brown County | $2,000 |
| Reconstruct and widen CTH AAA/Oneida St. between Hansen Road and Cormier Road including reconstruction of SH 172 overpasses, Brown County | $2,000 |
| Reconstruct SH 33, including the planned bicycle/pedestrian component, between Port Washington and Saukville, Ozaukee County | $1,000 |
| Reconstruct U.S. 41/SH 144 interchange near Slinger | $1,000 |
| Reconstruct Wisconsin State Highway 21 at I-94 Interchange, Monroe County | $1,000 |
| Construct bicycle/ pedestrian path and facilities in the Central park area of Madison | $700 |
| Construct a bicycle/ pedestrian path, Wisconsin Dells. | $500 |
| Construct a bicycle/ pedestrian path from Waunakee to Westport | $500 |
| Construct an alternative connection to divert local traffic from I-90, a major highway, and allow movement through the Gateway commercial development project. | $1,000 |
| Reconstruct Highway 151 from American Parkway to Main Street, Sun Prairie | $2,000 |
| Replace Highway 10 bridge over the Chippewa River near Durand. | $2,000 |
| Construct Eau Claire bypass on U.S. 53 in Eau Claire | $2,000 |
| Replace the 17th Street Lift Bridge, Two Rivers. | $2,000 |
| Pioneer Road Rail Grade Separation (Fond du Lac, Wisconsin) | $1,000 |
| Upgrade Highway 26 between Janesville and Watertown | $3,000 |
| Reconstruction of the Marquette Interchange, Milwaukee WI | $30,000 |
| Construction and reconstruction of the U.S. Highway 41 corridor between Milwaukee and Green Bay, Wisconsin | $30,000 |
| Wisconsin Supplemental Transportation Rural Assistance Program -- WI DOT | $8,000 |
| "Milwaukee, WI Rehabilitate Inermodal transportation facility at downtown Milwaukee's Amtrak Station, increase parking for bus passengers " | $3,762 |
| "Wisconsin, Statewide Buses and Bus Facilities " | $2,560 |
| State of Wisconsin buses and bus facilities | $13,669 |
| State of Wisconsin Transit Intermodal Facilities | $5,000 |