| Construction of Segment #1 of Morrison Road for the City of Brownsville | $1,600 |
| Extension of SH 349 to U.S. 87 Relief Route in Dawson County | $2,000 |
| Construct two connectors between SH 288 and Beltway 8 | $1,800 |
| The SH 146, Port Rd. direct connectors allows traffic bypass several rail lines and traffic signals at, near intersection of SH 146 and Port Rd | $10,560 |
| Paving of County Roads 3230 and 3240 connecting FM 1158 to FM 1159 Northeast of Clarksville, TX | $1,000 |
| Construct passing lanes on Texas State Highway 16 in Atascosa County | $797 |
| Construct street and drainage improvements to road system in Encinal | $250 |
| Construct SH 183 from SH 360 to Belt Line Road in Irving, Texas | $1,600 |
| SH 44 E of Alice near SH 359 to U.S. 281, Jim Wells County | $1,600 |
| Hidalgo County Loop | $800 |
| Construct a segment of FM 110 in San Marcos | $1,000 |
| Big Spring, TX Construction of the Big Spring Reliever Route | $7,320 |
| Construction of Lake Ridge and U.S. 67 Project, Cedar Hill, TX | $2,800 |
| Design, construction, and streetscape improvements to enhance pedestrian access, pedestrian access to bus services and facilities | $800 |
| Construct Depression of Belt Line Road at I'35 E Intermodal Transportation Project in Carrollton, TX | $5,600 |
| Construct new location highway and interchanges on Inner Loop, from Global Reach to Loop 375 including the Global Reach ext., El Paso | $12,800 |
| Acquire Kelly Parkway Corridor Right-of-way through San Antonio | $400 |
| Improvements to U.S. 183 in Gonzales County | $400 |
| Build Arkansas Street Grade Separation in Laredo | $1,000 |
| Convert discontinuous 2-way frontage roads to continuous one-way frontage roads on IH 30 in Texarkana, TX | $4,000 |
| Regional bicycle routes on existing highways in Austin, TX | $800 |
| Reconstruct I'35E Trinity River Bridge, Dallas | $12,000 |
| Construct Mission Trails Project Packages 4 and 5 in San Antonio | $3,820 |
| IH37 frontage roads in Mathis | $1,600 |
| Construct and rehabilitate pedestrian walkways along the Main Street Corridor to improve transit-related accessibility | $800 |
| City of Robstown Trade Processing and Inland Center | $5,000 |
| Widen Motor Street thoroughfare in Dallas to improve accessibility to Southwestern Medical District | $4,400 |
| Development of one-story 300-vehicle parking facility | $1,200 |
| Widen U.S. 271 from a 2-lane facility to a 4 lane divided facility from Paris, TX to Pattonville, TX | $1,600 |
| SH 146 grade separation over Red Bluff Rd | $13,600 |
| Bridge Access Road for FM 493 from U.S. 281 to U.S. 83 | $5,000 |
| Washington Boulevard Improvements in Beaumont, Texas | $2,080 |
| Interchange improvements IH'30 Arlington at FM 157 (Collins Street) and Center Street | $1,600 |
| Reconstruct Mile 6 W from US83 to SH 107, Hidalgo County | $800 |
| FM 1637 from FM 3051 to FM 185, Waco | $1,600 |
| FM 3391 (East Renfro St.) from I'35W to CR 602, Burleson | $2,200 |
| Drainage Study and Engineering for U.S. 83 in Starr County | $800 |
| Construct Phase II of City of Killeen SH 201 | $4,800 |
| Nolana Loop from FM 1426 to FM 88, Hidalgo County | $1,600 |
| Conduct reconstruction and managed lanes project on Airport Freeway (SH 183'SH 121) from IH 820 to the Dallas County Line | $4,000 |
| Conduct Preliminary Engineering for Funnel Project on SH 114 from BS 114L to Dallas County Line and on SH 121 from SH 360 to Dallas Co Line | $3,200 |
| For right-of-way acquisition and construction of Seg 5 and 6 of SH 130 from 183 to Seguin, TX | $4,800 |
| Widen SH 24 from a 2-lane facility to 4-lane divided facility from SH 19 to Cooper, TX | $1,600 |
| Carlton road grade separation, Laredo, TX | $4,000 |
| Implementation and quantification of benefits of large-scale landscaping along freeways and interchanges in the Houston region | $22,797 |
| Widening from two lanes to four of SH 36 from Bellville, TX to Sealy, TX | $7,200 |
| Build 36th Street Extension in San Antonio | $1,680 |
| Improvements to FM 1979 in Caldwell County. | $240 |
| Construction of highway infrastructure to provide flood protection for Nueces County. | $800 |
| Widening FM 60 (University Drive) from SH 6 to FM 158, College Station | $2,400 |
| Extend Munn Street from Demaree Ln. to Gellhorn Drive. | $800 |
| Widening 349 Dawson and Martin County. | $1,600 |
| Colonial Drive Project, Cleburne | $1,200 |
| Improvements to FM 676 in Alton. | $400 |
| Construct a pedestrian/ bicycle trail in the Sunnyside area of Houston. | $750 |
| Construct remaining 800- foot 4-lane divided thoroughfare for Preston Rd. segment between Beltway 8 and Genoa Red Bluff Rd | $928 |
| Improvements to South McColl Road in Hidalgo County | $1,920 |
| Widen U.S. 82 from 2-lane facility to 4-lane facility from FM 1417 in Sherman, TX to U.S. 69 in Bells, TX. | $3,600 |
| Widen U.S. 79, from FM 1512 near Jewett to IH-45 to a 4-lane divided highway | $1,600 |
| Widen U.S. 287 Bypass at Ennis from two to four lanes. | $6,400 |
| Construction of the interchanges at BI20 and IH20 for JBS Parkway | $2,000 |
| Improvements to FM 716 in Duval County | $800 |
| Construct Loop 20 in Laredo | $1,600 |
| Widen SH 317 from two lanes to four lane divided facility | $1,600 |
| Widen SH 205 from two lanes to a six lane urban divided highway from North of SH 66 to proposed SH 276 | $800 |
| Construction of ferryboat for City of Port Aransas | $320 |
| Expansion of Port Rd. at Northbound Frontage Rd. of SH 146 east to intersection with Cruise Terminal Rd. to 6-lane section with raised median | $9,552 |
| Expansion of Daniel McCall Dr., Lufkin, TX. | $2,200 |
| Port of Beaumont Southside Intermodal Project | $5,190 |
| The District-Tyler Outer Loop 49 Construction | $5,184 |
| Port of Corpus Christi Joe Fulton International Trade Corridor for congestion and safety enhancements. | $400 |
| Build Bike Trail at Chacon Creek in Laredo. | $3,300 |
| Construction of internal roads at Port of Brownsville to make roads safer with less wear and tear | $2,000 |
| Reconstruct Danieldale Rd. from I-35E to Houston School Rd. in Lancaster. | $1,600 |
| Hike and bike trail will tie into the Gellhorn Drive project providing an improved multimodal transportation facility. | $800 |
| Construction of streets in the White Heather area of Houston. | $9,250 |
| Construct bicycle and pedestrian trails in Houston's historic Third Ward | $600 |
| Construction of highway medians, pedestrian walkways for City of South Padre Island | $400 |
| Rehabilitate Yale Street between IH 10 to IH 610. | $800 |
| Extension of FM 1427 in Penitas. | $560 |
| Cottonflat Road overpass at Interstate 20. | $1,200 |
| Construct highway improvements on E. Tidwell, Ley Rd., and E. Little York Rd | $2,000 |
| Reconstruct I-30 Trinity River Bridge, Dallas | $20,000 |
| Bicycle and Pedestrian Trail Network in East Austin | $7,680 |
| ROW acquisition for 87 Relief Route | $1,200 |
| Improvements to IH-35E from U.S. 77 North of Waxahachie to U.S. 77 South of Waxahachie. | $3,200 |
| Lubbock, Texas Construction for Marsha Sharp Freeway main lanes between Chicago and Salem Avenues. | $12,440 |
| Design and construction streetscape improvements in Midtown, enhance pedestrian access. | $800 |
| East 7th Street Improvements in Austin | $420 |
| Construct Links Hike and Bike Trail Project. 2.2 mile trail project connecting Gaylord Texan to Grapevine Mills Mall. Grapvine, TX | $400 |
| Ritchie Road from FM 1695 to U.S. 84, Waco | $2,400 |
| Reconstruction of U.S. 79 from FM 1460 to Williamson County Road195 | $1,600 |
| San Angelo Ports-to-Plains Route Loop 306 at F.M. 388 | $1,200 |
| Add shoulders to FM 156 from Ponder, Texas to Krum, Texas. | $1,600 |
| IH 820 Widening Project | $1,600 |
| Construction of divided four lane concrete arterial with drainage improvements--Sandy Lake Road: Denton Tap Rd. to North Coppell Road | $800 |
| Reconstruct and add two lanes to U.S. 287 from the Oklahoma State line to U.S. 54 in Stratford | $5,600 |
| Reconstruct Precinct Line Road 2-lane bridge as 4- lane bridge and widen Precinct Line Road to 4- lane roadway from SH 10 to Trammel Davis Rd | $800 |
| Reconstruct Mile 2 W from Mile 12 N to U.S. 83, Hidalgo County | $800 |
| Build south bound ramp from east bound I-20 to Clark Road at the southern terminus of Spur 408. Duncanville, TX. | $4,400 |
| U.S. 90--Construct 6 mainlines from east of Mercury to east of Wallisville. | $1,600 |
| Design and Construct the Cottonwood Trail pedestrian-bicycle connection | $800 |
| Construct a reliever route on U.S. 287 South of Dumas to U.S. 287 North of Dumas | $2,400 |
| Dowlen Road Improvements for Beaumont, Texas. | $2,765 |
| Construct raised median from Loop 224 to Sradley St. in Nacogdoches, TX | $2,680 |
| Old Reliance Road Overpass at SH 6 (Earl Rudder Freeway)--Widening project in Brazos Co | $2,000 |
| Reconstruct and add two lanes to IH 27 from Western Street in Amarillo to Loop 335. | $4,800 |
| U.S. 290 Improvements in Austin, TX | $2,400 |
| Design and construct streetscape improvements to Old Spanish Trail--SH 288 to Griggs, Griggs to Mykawa | $800 |
| Acquisition of right-of-way and environmental preservation from I-45 to U.S. 59 for Grand Parkway. | $11,200 |
| Contruct grade separation at U.S. 59 and SH 99. Replace the proposed interim cloverleaf ramps at the intersection. | $4,000 |
| Reconstruct Clinton Drive from Federal Rd. to N. Wayside Drive. | $11,200 |
| Construct SH 199 (Henderson St.) through the Trinity Uptown Project between the West Fork and Clear Fork of the Trinity River in Fort Worth | $6,400 |
| Construct landscaping and other pedestrian amenities in segments of the Old Spanish Trail and Griggs Road rights-of-way | $1,600 |
| Repair 4.35 miles of Lake Ridge Parkway. Widen roadway along with 2 bridges from 4 lanes to 6 across Joe Poole Lake in Grand Prairie, TX. | $4,800 |
| I Road Between Nolana Loop and FM 495 in Hidalgo County | $1,520 |
| Construct Southwest Bypass in Georgetown, Texas, between SH 29 and Ranch Road 2243. | $3,200 |
| Construct a bridge impact protection system for TxDOT. | $400 |
| Two direct connectors in Houston, Texas between IH 10 and SH 99, The Grand Parkway. | $4,000 |
| Construct Loop 12-IH 35E and SH 183 west extension to MacArthur, Irving, Texas. | $800 |
| Construct 4 lane divided roadway along SH 71 from the Perdernales River to Bee Creek. | $1,600 |
| Construct 25 mile stretch of the 177-mile loop, between IH-45 south and SH 288 | $9,200 |
| Grade separation bridges at Wintergreen Rd. and Millers Ferry Rd. in Hutchins and Pleasant Run Rd. and Millers Ferry Rd. in Wilmer. | $6,560 |
| Improvements to FM 1017 in Hebbronville | $400 |
| Construct Grade separation at U.S. 277 in Eagle Pass. | $4,000 |
| Reconstruction of West Airport between U.S. 59 and Kirkwood in the City of Meadows Place, Texas. | $320 |
| Completion of U.S. 77 relief route around City of Robstown. | $2,400 |
| SH 71 from W of FM 20 to Loop 150, Bastrop County | $1,600 |
| For center to center communication link between highway traffic transportation management centers. | $800 |
| Build I-30 Trinity River Bridge, Dallas, Texas. | $800 |
| Widen from 4 to 6 lanes Interstate 35 East from Lake Lewisville to Loop 288 | $5,600 |
| Widen Hempstead Highway from 12th Street to Washington Avenue from four lanes to six lanes. | $800 |
| Relocation of 10th Street near McAllen-Miller International Airport. | $600 |
| Construct Loop 574 from BU 77 to I-35 in McLennan Co. | $1,600 |
| Port of Corpus Christi Up River Road for upgrade of roadway to and from docks and IH 37. | $400 |
| Donna/Rio Bravo International Bridge | $1,600 |
| Choate Road overpass to eliminate at-grade intersection between Choate Rd. and SH 146. | $7,840 |
| Construct U.S. Business 287 through the Trinity Uptown Project from 7th St. NE to 11th St. NE in Fort Worth. | $6,400 |
| Hwy 80/123 Overpass at Hwy 181 in Karnes County | $240 |
| FM 544, widen 2-lane roadway to 6-lane roadway from SH 121 to Dozier- Parker Road. | $1,600 |
| Construct an alternate truck route to Interstate 35 in Buda | $500 |
| Lajitas Relief Route. | $1,200 |
| Conduct study of I-10 and U.S. 190 with a focus on congestion relief and the need for a military and emergency relief transportation corridor. | $160 |
| Construct Fredericksburg Road-Medical Drive grade separation in San Antonio. | $3,040 |
| Del Rio-Laughlin Air Force Base Relief Route. | $11,600 |
| Construction of mainlanes and interchanges on SH 121 from Hillcrest to U.S. 75. | $12,800 |
| New construction for the SH 349 Reliever Route beginning at the SH 191 intersection in Midland. | $2,000 |
| FM 937 from SH 164 to FM 3371, Limestone Co | $1,600 |
| Construct I-635/35E Interchange in Dallas, TX. | $3,600 |
| Reconstruct Ella/Wheatley from Little York to West Gulf Bank. | $1,000 |
| Construct Santa Fe Trail DART LR overpass from Hill St. to Commerce St. along abandoned Santa Fe Rail right-of-way in Dallas | $800 |
| Develop, deploy and integrate municipal ITS in San Antonio. | $2,560 |
| Downtown Streetscape Improvements in Beaumont, Texas. | $512 |
| Implement repairs on Old Pleasanton Road Bridge in Atascosa County. | $403 |
| Construct I-635/I-30 Interchange, Dallas, Texas | $12,000 |
| Grimes Co., TX Bridge Improvement Project. | $400 |
| Austin to Manor Rail Trail, Texas. | $1,600 |
| Construct Interstate 35 improvements in Buda | $1,000 |
| Tower 55 CMAQ Congestion and Preliminary Engineering Study. | $1,600 |
| Barron Rd. Interchange at SH 6 (Earl Rudder Freeway) College Station. | $2,400 |
| Construct access road connecting Port of Beaumont property on east bank of Neches River to I- 10 access road east of the Neches River | $1,440 |
| U.S. 281 from Brooks County Line to FM 3066, Brooks County | $1,600 |
| Construct IH 30 Monty Stratton Parkway Interchange in Greenville, TX | $1,200 |
| Pedestrian Path and Sidewalk Improvements along U.S. 83 in Rio Grande City. | $400 |
| Reconstruct Loop 12 IH 35E and SH 183 west extension to MacArthur, Irving, Texas. | $4,000 |
| Abilene, TX, Dyess Air Force Base North Entry Access Project with related improvements | $11,120 |
| Loop 281 Mobility and Safety Improvements, Longview, TX | $2,736 |
| Upgrade Fulghum Road Bridge on I-45 in Dallas County (TX) to provide safety and access for expanded intermodal traffic | $2,480 |
| Construct Park Row bypass from Texas State Highway 6 to the Eldridge Parkway in Houston, TX. | $1,600 |
| Loop 180 (Project code 1190- 01-035) in Whitney, TX from FM 933/FM 1713 to FM 933S of Whitney. | $800 |
| U.S. 377 from SH 144 to the eastern intersection of BUS 377H, Hood Co. | $3,000 |
| Reconstruct Union Pacific Railroad bridge over widened Business U.S. 287. | $800 |
| Environmental mitigation related to the SH 195 project and related improvements in Williamson County that had adverse effects on the Karst cave system | $1,600 |
| U.S. 90--Construct 6 mainlanes from east of Mercury to east of Wallisville. | $1,600 |
| Construct access road connecting Port of Beaumont property on east bank of Neches River to I- 10 access road east of the Neches River | $1,056 |
| Reconstruct I-30 Trinity River Bridge--Dallas, TX | $27,200 |
| Reconstruct I-30 Trinity River Bridge--Dallas, TX | $800 |
| Construction of projects that relieve congestion in and around the Texas Medical Center complex | $9,600 |
| Expansion of U.S. 385 4- lane divide south of Crane to McCarney. | $1,600 |
| FM 156 Road Relocation at Alliance Airport, Texas. | $6,500 |
| Upgrade Caesar Chavez Boulevard from San Antonio Street to Brazos Street. | $2,400 |
| North Cameron County East- West Railroad Relocation Project. | $80 |
| Construct pedestrian walkway on Houston Texas' Main Street Corridor | $1,000 |
| Access to Regional Multimodal Center--FM 1016 and SH 115 | $1,600 |
| North Rail Relocation Project, Harlingen | $1,600 |
| Conduct feasibility study for an off ramp on I-30 on to Hall Street for direct access to Baylor University Medical Center in Dallas. | $800 |
| Continuation of item number 92 of the table contained in section 1602 of the Transportation Equity Act for the 21st Century (Public Law 105-178) | $1,120 |
| Replacement of the I-30 Bridge over the Trinity River in Dallas. | $17,000 |
| Replacement of the Galveston Causeway Railroad Bridge in Galveston. | $15,000 |
| Construction of a new international rail bridge and rail track west of Brownsville. | $4,000 |
| Construction of a three mile bypass around central San Marcos | $10,000 |
| Construction of a railroad grade separation at Calton Rd. in Laredo, TX (part of the West Laredo Multimodal Trade Corridor). | $6,000 |
| Transportation Improvements for the San Angelo Ports to Plains Route 306 at FM 388 | $5,000 |
| Reconstruct Mile 6 West from U.S. 83 to SH 107 Hidalgo County | $2,000 |
| Tyler Outer Loop 49 Construction | $3,000 |
| Transportation Improvements to Cotton Flat Road Overpass @ Interstate 20 | $3,000 |
| Construction of a parking facility at the University of the Incarnate Word, San Antonio, Texas | $2,000 |
| Research and construction, Southwest Center for Transportation Research and Testing, Pecos, TX | $1,000 |
| Construct a reliever route on U.S. 287 south of Dumas to U.S. 287 north of Dumas | $3,000 |
| Widen FM 60 (University Drive) from SH 6 to FM 158, College Station | $2,000 |
| Complete U.S. 77 relief route around City of Robstown | $4,000 |
| North Rail Relocation Harlingen. | $4,000 |
| Improvements to KellyUSA 36th Street. | $2,000 |
| Beaumont, TX Washington Blvd. Improvements | $1,000 |
| Improvements to Cottonwood Trail. | $1,000 |
| Improvements to FM 110 in San Marcos | $1,000 |
| Improvements to SH 71 from W of FM 20 to Loop 150 Bastrop County | $2,000 |
| Construct 6 mainlines from east of Mercury to east of Wallsville | $2,000 |
| "Brownsville Urban System, TX--City-Wide Transit Improvement Project " | $4,000 |
| "Brownsville, TX Brownsville Urban System City-Wide Transit Improvement Project " | $2,090 |
| "Dallas, TX Bus Passenger Facilities" | $10,701 |
| "Design Downtown Carrollton, Texas Regional Multi-Modal Transit Hub Station " | $1,672 |
| Dallas Area Rapid Transit-Bus passenger Facilities | $1,000 |
| "Abilene, TX Vehicle replacement and facility improvements for transit system " | $334 |
| "Bryan, TX The District-Bryan Intermdal Transit Terminal and Parking Facility " | $2,508 |
| "Capital Metropolitan Transportation Authority, TX-Bus Replacements " | $10,000 |
| "Carrollton, Texas Downtown Regional Multimodal Transit Hub" | $1,000 |
| "City of Round Rock, TX-Downtown Intermodal Transportation Terminal " | $1,000 |
| "Construct West Houston and Fort Bend County, Texas-bus transit corridor" | $1,672 |
| "Corpus Christi, TX Corpus Regional Tranist Authority for maintenance facility improvements " | $2,090 |
| "Galveston, Texas-Intermodal center and parking facility, The Strand" | $3,762 |
| "Roma, TX Bus Facility" | $439 |
| "San Angelo, TX Street Railroad Company-Transit Fleet Replacement " | $1,000 |
| "The District, The Woodlands, TX-Bus Replacement Program " | $1,000 |
| "Zapata, Texas Purchase Bus vehicles" | $261 |
| Harris County-West Houston-Fort Bend Bus Transit Corridor: Uptown Westpark Terminal | $1,000 |
| Laredo-North Laredo Transit Hub-Bus Maintenance Facility | $3,000 |
| METRO of Harris County-Discretionary Bus Program | $10,000 |
| "San Antonio, TX Improve VIA bus facility and purchase new buses " | $5,852 |
| "VIA Metropolitan Transit Authority, TX-Bus & Bus Facility Improvements " | $5,000 |