| Build extension of North Rhett Boulevard from Liberty Hall Road to U.S. 176 in SC | $5,600 |
| Extension and expansion of Lower Richland Roads Phase I | $560 |
| Build Railroad Avenue Extension in Berkeley County, SC'SCDOT | $1,600 |
| Build Berlin Myers Extension in Summerville, SC | $6,400 |
| Build Carolina Bays Parkway Segment from SC 544 to U.S. 17 in Myrtle Beach, SC | $2,400 |
| Construction of interchange at I'385 and SC 14, Exit 19, in Laurens County, South Carolina | $1,760 |
| Construct Briggs-Pearson-DeLaine Connector | $16,080 |
| Construction of the U.S. 15/SC'341 connector parallel to I'20, Lee County | $3,600 |
| Widen West Georgia Road from Neely Ferry Road to Fork Shoals Road | $1,600 |
| Widening and improvements of SC Highway 5 Bypass in York County | $1,600 |
| Construct Hub City Connector Passage (12.5 miles of bicycle-pedestrian improvements, 176'SC 56), part of state-wide Palmetto Trail Project | $800 |
| Engineering, design, and construction of I'73 from the North Carolina State Line to I'95 | $8,000 |
| Widening of Boiling Springs 9 from Rainbow Lake Rd. to SC 292 | $4,800 |
| Widening of Frontage Road from U.S. 72 to U.S. 56, Laurens, SC | $2,240 |
| Medical University of South Carolina Roadway Enhancement. | $3,200 |
| Build Interchange at U.S. 17 and Bowman Road in Mount Pleasant, SC | $4,800 |
| Build 701 Connector (Southern Conway Bypass) in SC. | $4,000 |
| Plan and build Interstate 73 from NC line to Myrtle Beach, SC. | $8,000 |
| Extension of Wells Highway, Oconee County, South Carolina | $1,600 |
| SCSU Transportation Center, Orangeburg | $5,200 |
| Construct I-85 Brockman- McClimon Interchange between Greenville Spartanburg Airport and SC Highway 101 interchanges | $800 |
| Replace Milford Road Bridge, Anderson, SC | $400 |
| Replace Murphy Road West Bridge, Anderson, SC | $188 |
| Replace Murphy Road East Bridge, Anderson, SC | $212 |
| Complete construction of Palmetto Parkway (I520) Extension (Phase II) to I- 20 | $5,600 |
| Construct roadway btwn I-26 and U/S/ 1 in Lexington County. Intermodal connector from U.S. 1 to I- 26 and I-77. SC 302 and SC 602 improvements | $1,600 |
| Construct grade separation and interchange improvements at U.S. 521, Lancaster County | $800 |
| Lexington County, widen U.S. 1 and SC 6, and improve U.S. 1, SC 6, and U.S. 378 | $1,600 |
| Construction of public roads at the International Center for Automotive Research and reconstruction of Fairforest Way in Greenville, South Carolina | $4,800 |
| Upgrade of the I-95/SC 327 Interchange near Florence. | $6,000 |
| Pine Needles Widening and Bridge Replacement | $1,600 |
| Improve intersection and corridor on U.S. 278 to improve safety. Poss build frontage roads widen road and change traffic controls | $9,600 |
| Upgrade Hwy 21 Bypass Grade Crossings. | $560 |
| Construction of I-73 from Myrtle Beach, SC to I-95, ending at the NC State line | $10,000 |
| Widening of U.S. 278 to six lanes in Beaufort County, SC between Hilton Head Island and SC 170. | $15,000 |
| Engineering, design and construction of a Port Access Road connecting to I-26 in North Charleston, SC | $10,000 |
| Improvements to U.S. 17 in Beaufort and Colleton Counties to improve safety between U.S. 21 and SC 64. | $10,000 |
| Widening of SC 9 in Spartanburg County from SC 292 to Rainbow Lake Road | $2,000 |
| Complete Construction of Palmetto Parkway Extension (I-520) Phase II to I-20 | $3,000 |
| Complete a multi-lane widening project on SC Hwy 5 Bypass in York County, SC between I-77 and I-85 | $4,000 |
| Re-construction of an existing interchange at I- 385 and SC 14, in Laurens County | $2,000 |
| Construction of the Lexington Connector in Lexington County, to alleviate traffic congestion | $2,000 |
| Widening of 4.4 miles of West Georgia Road in Greenville County. | $2,000 |
| Extension of Wells Highway in Oconee County | $2,000 |
| Demolition of the old Cooper River Bridges in Charleston | $5,000 |
| Transportation Improvements for the I-73 in South Carolina-Proposed interstate corridor beginning at NC State line continuing to the Grand Strand area of SC. | $5,000 |
| Transportation Improvements for the U.S. 278 in Beaufort/Jasper County to alleviate roadway capacity constraints and improve safety and operations. | $2,000 |
| ICAR Roads, Greenville, reconstruction of roads around Fairforest Way for better flow into ICAR. | $2,000 |
| Harden Street Improvements in Columbia. Specific improvements will include: modern traffic control signals, intersections, improved street lighting, driveways etc. | $5,000 |
| Palmetto Parkway, Phase 2 is approximately 6 miles long and begins at U.S. 1/ 78 and terminates at I-20. | $3,000 |
| Lexington Connector in South Carolina, to alleviate traffic congestion along three major thoroughfares in Lexington County: U.S. 1, U.S. 378, and SC 6 | $1,000 |
| I-77/Peach Road Interchange in Fairfield County, SC, project would create interchange to encourage development at industrial park | $3,000 |
| I-95/SC 327 in Florence, SC, to construct northbound ramp and expand existing ramps | $3,000 |
| Transportation Improvements for Highway 901, York County, SC | $1,000 |
| The Extension of the Mark Clark Expressway in Charleston County. | $3,000 |
| I-73, Construction of I-73 from Myrtle Beach, SC to I-95, ending at the North Carolina State line | $40,000 |
| Planning, design, and construction of the I-73 corridor of national significance in South Carolina | $10,000 |
| "Greensville, SC Transit Authority-City of Greenvile Multimodal Transportation Center Improvements " | $1,000 |
| South Carolina Department of Transportation-Transit Facilities Construction Program | $2,000 |
| South Carolina Department of Transportation-Vehicle Acquisition Program | $8,000 |