| Land acquisition for the widening of Rt. 47 in Yorkville, IL | $4,000 |
| Preconstruction and Construction of IL 83 at IL 132 | $800 |
| Construct Bike, Pedestrian Paths, Orland Hills | $320 |
| Parking facility in Peoria, IL | $800 |
| Construct Interchange on Interstate 255/Davis Ferry Road, Dupo | $17,500 |
| Reconstruction of Mockingbird Lane and Stratford St, Granite City | $1,600 |
| City of Havana, Illinois Upgrades to Broadway Street | $762 |
| IL 29 from IL 6 to I'180'Phase 2 study and land acquisition | $1,600 |
| Upgrade streets in the City of Rushville, IL | $800 |
| Improve University Drive, Macomb | $400 |
| West Ridge Nature Preserve, Chicago | $2,800 |
| Improve Great River Road, Warsaw | $600 |
| Construct streetscape along Morse avenue from Clark street to Sheridan road, Chicago | $1,600 |
| Preconstruction activities IL 336 from Macomb to Peoria | $1,600 |
| Replacement of bridge on Harlem Avenue, The Village of River Forest | $800 |
| Construct Bissel Street Roadway Connector, Tri-City Regional Port District | $800 |
| Improve North Illinois St. and related roads, Belleville | $5,000 |
| Upgrades for Muller Road in the City of Washington, IL | $224 |
| Upgrade roads, The Village of Berkeley | $800 |
| Construct new bridge on Illinois Prairie Path over East Branch River in Milton Township, IL | $240 |
| Widening two blocks of Poplar St. from Park Ave. to 13th Street, Williamson County | $384 |
| For IDOT to conduct Phase II engineering for reconstruction of 159th St./US 6/IL 7 in Will and Cook Counties | $800 |
| For Will County to begin Phase II engineering and preconstruction activities for a high level bridge linking Caton Farm Road with Bruce Road | $1,600 |
| Construct Citywide bicycle path network, City of Evanston | $200 |
| Improve Roads and Bridges, Cook County | $3,200 |
| Construct Reed Station Parkway Extension to IL Rt. 3, Carbondale | $1,655 |
| Engineering and construction of the East Branch DuPage River Greenway Trail in central DuPage County, IL | $80 |
| To construct a new 2-lane road extending 1650 feet north from intersection with University Park Drive, Edwardsville | $400 |
| Development and construction of an interchange at Brisbin Rd. and Interstate 80 | $4,800 |
| Construction of a pedestrian sidewalk along S. Chicago Street in Geneseo, IL | $180 |
| South Shore Drive and 67th Underpass | $1,040 |
| Resurface Clifton Park Ave. and S. Louis Ave., Village of Evergreen | $320 |
| State Street Road Improvements from 43rd Street to IL Rt. 157, East St. Louis | $3,080 |
| Study, design, and construction of a designated truck route through the City of Monticello | $906 |
| Improve roads, The Village of Westchester | $800 |
| Construction of 2 North/South Blvds. and 2 East/West Blvds. in the vicinity of Northern Illinois University | $8,320 |
| Upgrade Ridge Avenue, Evanston | $2,400 |
| Repair of CH 29 and reconstruction of CH 8 at interchanges with Interstate 55 at Towanda and Lexington, Illinois | $800 |
| Construct Streetscape Project, Orland Hills | $320 |
| Reconstruct Highway-Railway crossing over U.S. 14 and realignment of U.S. 14, Des Plaines | $1,600 |
| East Peoria, Illinois Technology Blvd. upgrades | $800 |
| Upgrade streets, Stickney Township | $2,206 |
| Construct four lane extension of IL RT29 from Rochester to Taylorville | $480 |
| Widening of Old Madison Road, St. Clair County | $1,600 |
| Replacement of Fullerton Avenue Bridge and Pedestrian Walkway | $3,840 |
| Reconstruct Milwaukee Avenue, including Six Corners | $13,600 |
| Construct West Corbin Overpass over Illinois 255, Bethalto. | $4,000 |
| Reconstruction and realignment of Baseline Rd., Montgomery, IL. | $1,664 |
| Widening and Reconstruction of 55th Street from Holmes Avenue to Williams Street in Westmont and Clarendon Hills. | $1,200 |
| Road upgrades for the Village of Oreana, IL. | $707 |
| Improve safety of culvert replacement on 250th Rd. between 460th St. and County Hwy 20 in Grandview Township, Edgar County, IL | $256 |
| Upgrade traffic signal system on 87th Street, Chicago. | $400 |
| Engineering of the Willow Creek Trail Extension from Rock Cut State Park to the Long Prairie Trail | $160 |
| For engineering, right-of- way acquisition and reconstruction of two existing lanes on Arsenal Road from Baseline Rd. to Rt. 53 | $1,700 |
| Resurfacing Congress Parkway The Illinois Department of Transportation | $400 |
| City of Bartonville, Street widening and improvements and sidewalk improvements. | $762 |
| The continuation of U.S. Route 12 from the Wisconsin State line to the intersection of Tryon Grove Road, Route 12 and Illinois State Route 31. | $2,400 |
| Widen U.S. Route 67 from Macomb to Illinois 101 | $1,600 |
| Widen U.S. Route 51 from Pana to Vandalia | $2,400 |
| Widen U.S. Route 34 from U.S. 67 to Carmen Road | $3,200 |
| Widen Rakow Road from Ackman Road to IL Rt. 31 in McHenry County, Illinois | $5,720 |
| Widen U.S. Route 30 from Rock Falls to Round Grove, Whiteside County | $400 |
| Perform Broadway and Sheridan Road signal interconnect project, Chicago. | $1,200 |
| Widen U.S. Highway 30 in Whiteside County, Illinois | $800 |
| Improve Highway-Railroad Crossings, Galesburg | $600 |
| Land acquisition, engineering, and construction for the initial 2-lane segments of the Corridor between IL 31 to IL 25 and other segments of the Corridor as appropriate | $4,000 |
| Expand and improve Illinois Route 47 Roadway from Reed Road to Kreutzer Road in Huntley, Illinois. | $5,720 |
| For widening from two to four lanes, the Brookmont Boulevard Viaduct in Kankakee, IL and adjusting approach grades. | $800 |
| Reconstruct intersection of Wood Dale and Irving Park roads in DuPage County, IL | $11,440 |
| Construct multi-use pedestrian path between Oakton St. and Dempster St., Skokie. | $200 |
| Development of a coordinated trail system, parking and trial systems in Dixon, IL | $2,560 |
| For Village of Lemont to construct a bridge over Chicago Ship and Sanitary Canal linking Centennial Trail to I&M Canal Trail | $80 |
| For IDOT to expedite pre- construction and construction to widen I-55 from Naperville Road south to I-80. | $2,800 |
| Complete Heavy Truck Loop for DuQuoin Industrial Park | $500 |
| Transportation Enhancement and road improvements necessary for Downtown Plaza improvements in Jacksonville, IL | $762 |
| Implement ITS and congestion Mitigation Project on I-294 and I-90. | $3,200 |
| Streetscape improvements on Blue Island from 19th-21st St, Chicago. | $800 |
| Upgrade connector road from IL Rt. I-255 to IL Rt. 3, Sauget | $1,920 |
| Improve Great River Road, Mercer County. | $400 |
| Construct underpass at intersection of Damen/ Fullerton/Elston Avenues, Chicago. | $4,400 |
| Foster Avenue at Kedzie Avenue Streetscape | $1,600 |
| Construct Streetscape Project, Village of Robbins. | $640 |
| For Will County for engineering and right-of- way acquisition to extend 95th Street from Plainfield-Naperville Road east to Boughton Road. | $400 |
| Reconstruction of 5th Street Road (FAS 569) in Logan County, IL | $762 |
| Construct pedestrian walkways and streetscaping projects in the Village of Western Springs. | $3,554 |
| Preconstruction and Construction at IL 31 from Bull Valley Road to IL 176 | $1,936 |
| Reconstruct Lakeshore Drive Overpass over Wilson Avenue, Chicago. | $1,200 |
| Road Construction and reconstruction in the Village of Hampshire: Keyes Ave., Industrial Drive Overlay, and Mill Avenue | $1,840 |
| Conduct study and design of Chicago North lakefront path expansion project | $800 |
| 130th and Torrance Avenue Intersection Improvement, Chicago. | $7,200 |
| Construct and expand Northwest Illinois U.S. Rte 20 from Freeport to Galena, IL | $3,200 |
| Improve U.S. Route 34 from Kewanee to Kentville Road. | $400 |
| For Naperville Township to fund improvements to North Aurora Road. | $160 |
| Construction of a bridge at Stearns Road in Kane County, Illinois | $70,400 |
| Construct a four lane connection between Rt. 13 and Rt. 45 and upgrades to Netty Green Road in Saline Co., Illinois. | $1,600 |
| Relocate Pocket Road/ Lakewood Place for Access to the Racehorse Business Park, Alorton. | $900 |
| Construct Commuter Parking Structure in the Central Business District in the vicinity of La Grange Road | $3,232 |
| River walk Reconstruction, City of Chicago. | $480 |
| For Naperville Township to fund improvements to Diehl Road between Eola Road and Route 59 | $640 |
| Reconstruct Lakeshore Drive overpass over Lawrence Avenue | $1,200 |
| Preconstruction and Construction at IL 120 at Bacon Road and Cedar Lake Road | $1,092 |
| Construct Streetscape Project, City of Markham | $400 |
| To construct a new intersection of a public road and U.S. Route 50 and a new street | $440 |
| Upgrade roads, The Village of Maywood | $800 |
| Construction of the 43rd Street Bicycle Pedestrian Bridge over Lake Shore Drive, City of Chicago | $480 |
| Upgrade Veterans Drive in Pekin, Illinois. | $800 |
| For DuPage County to construct certain segments of Southern DuPage County Regional Trail | $80 |
| Construction of part of a 230 mile corridor U.S. 67 near Jerseyville and Carrolton, Illinois. | $1,360 |
| Upgrade Curtis Road in conjunction with State plan for I-57 interchange; from Duncan Rd. to 1st Street in Champaign. | $5,600 |
| Perform Old Orchard Road Expansion and improvement project between Harms Road and U.S. 41, Cook County | $800 |
| Complete 80,000 lb truck route between CH 2 (Burma Rd) and IL Rt. 130 in Cumberland County. | $2,400 |
| Francis Cabrini/W. Green Homes CHA Street Construction, City of Chicago. | $480 |
| Henry Horner Homes CHA Street Construction, City of Chicago | $800 |
| Completion of the Grand Illinois Trail, Cook County | $1,034 |
| Design, land acquisition, and construction of South Main St. (IL 2) Corridor from Beltline Rd. to Cedar Street in Rockford, IL | $1,600 |
| Millburn By-Pass (US Route 45 at Gross Lake Road/ Millburn Road), Lake County | $2,080 |
| Construct I-80, Ridgeland Ave. Improvements, Tinley Park | $800 |
| Miller Road Widening and Improvement, McHenry | $6,364 |
| Robert Taylor Homes CHA Street Construction, City of Chicago | $440 |
| The extension of MacArthur Blvd. from Wabash to Iron Bridge Road. Springfield | $1,200 |
| Construct Cedar Creek Linear Park Trail, Quincy. | $400 |
| Design, land acquisition, and construct West State St. (US Business 20) from Meridan Rd. to Rockton Ave. in Rockford, IL | $1,600 |
| Resurface Trumbull Ave. and Homan Ave., Evergreen Park | $320 |
| Resurface Elston Avenue from Milwaukee to Pulaski, Chicago. | $1,600 |
| For U.S. Rt. 30 intersection signals, turn and deceleration lanes btwn Williams St. and IL Rt. 43 incl. 80th Ave, Wolf Rd., Lincoln Way HS and Locust St. | $5,600 |
| Preconstruction activities for Sangamon Valley Bicycle Trail (IL) | $400 |
| St. Charles Road, The Village of Bellwood. | $800 |
| Pre-construction and construction activities on U.S. 45/LaGrange Road from 131st Street to 179th Street | $800 |
| Increasing the height on the IL Rt. 82 Railroad Underpass in Geneseo, IL | $2,400 |
| Construction of a new bicycle-pedestrian bridge in Wayne, IL | $960 |
| Extend Frank Scott Parkway East Road to Scott AFB, St. Clair County | $2,240 |
| Village of South Jacksonville--West Vandalia Road upgrades | $762 |
| Pioneer Parkway upgrade in Peoria--Extension from Allen Road to Route 91 | $1,600 |
| Construction of CAP I-290 Village of Oak Park. | $800 |
| Pre-construction and construction IL 15 over Wabash River at Mount Carmel | $5,568 |
| Construct Illinois Route 336 from Macomb to Peoria. | $1,600 |
| For Village of Lemont to modernize and improve the intersection of McCarthy Road, Derby Road, and Archer Avenue. | $280 |
| Improve Cottage Grove intersection, South Chicago Avenue and 71st Street | $800 |
| Halsted Bridge over North Branch Canal Reconstruction, City of Chicago. | $480 |
| U.S. 67 west of Jacksonville, IL Bypass to east of IL 100 | $1,600 |
| Widen and improve Pulaski Road, Alsip. | $560 |
| Widen Annie Glidden Road to five lanes with intersection improvements. DeKalb, IL | $6,400 |
| Reconstruct Winter Ave, existing 1 lane RR subway, and 1 lane bridge to provide access to Winter Park in Danville | $4,320 |
| Construct pedestrian tunnel at railroad crossing in Winfield, IL | $800 |
| Upgrade streets and implement traffic and pedestrian safety signalization improvements, Oak Lawn | $3,920 |
| Improve Sheridan Road, Evanston | $1,600 |
| Construction of a traffic circle to reduce traffic congestion, Museum Campus Chicago. | $1,600 |
| Install traffic control devices on traffic signals in Village of Oak Lawn | $192 |
| To construct an extension of U.S. 51 from 9 miles south of Moweaqua to 4.6 miles south of Moweaqua. | $1,600 |
| Upgrade roads, The Village of Hillside. | $800 |
| To connect about a 2-mile segment through Collinsville at two or three lanes. | $1,600 |
| Construct Parking Facility and pedestrian walkways at 94th and S. Oak Park Ave, Oak Lawn | $192 |
| Improve Mill Street, Rock Island | $400 |
| For the Village of Woodridge to resurface Internationale Parkway | $86 |
| Interstate 41 and Route 176 Interchange replacement. | $600 |
| Road extension for Highway 22 in Macon County, IL | $534 |
| IL 8 from East Peoria to Washington, IL | $762 |
| Restoration and reconstruction of the central business district street. Cambridge, IL. | $960 |
| Improve 63rd Street, Chicago. | $1,600 |
| Establish transportation museum on Navy Pier, Chicago. | $432 |
| For the construction of the Grand Avenue Underpass, Village of Franklin Park | $928 |
| Resurface Yellow Banks Road, Franklin County. | $320 |
| Intersection Reconstruction at U.S. 12-IL 31 Tryon Grove Road | $720 |
| Construct Bridge Overpass, DuSable Museum-Chicago | $800 |
| Entry Road to Southern Illinois University Research Park, Carbondale. | $1,000 |
| Improve safety of a horizontal curve on Clarksville St. .25 mile north of 275th Road in Grandview Township, Edgar County, Illinois | $70 |
| Traffic Signalization, Matteson | $726 |
| Preconstruction and construction McCarthy Road, Bell Road to U.S. 45 and 123rd Street U.S. 45 to 86th Avenue in Palos Park | $714 |
| Establish transportation museum on Navy Pier, Chicago. | $400 |
| Road extension for Redco Drive to Skyline Drive, Williamson County. | $800 |
| I-57 and I-294 Interchange. | $2,400 |
| Construct recreational trail from Spring Creek Forest Preserve to Greene Valley Forest Preserve in DuPage County, IL. | $320 |
| Construct connector road between Collinsville Rd. to IL 3/North 1st St, St. Clair County | $4,800 |
| Extension North from Rt. 30 to Wheeler Road and Galena Boulevard extension west of Rt. 47 in Sugar Grove, IL | $3,808 |
| Improve Streets, Westchester. | $224 |
| Construction of a new roadway and grade separation of the UP West Line east of Elburn. | $7,600 |
| Allow IDOT to proceed with engineering and construction of Airport- Lockport Rd. and Illinois Route 126 interchanges on I-55 | $1,600 |
| Reconstruct and Widen Route 60 Bridge over I-94 in Lake Forest. | $9,000 |
| For Village of Bolingbrook to construct Remington Blvd. extension. | $400 |
| Irving Park Bridge over the Chicago River. | $3,200 |
| Midlothian Road Signalization, Lake Zurich | $480 |
| Eastern Peoria Bypass and (Ring Road) study and land acquisition. | $2,400 |
| Improve Streets, Merrionette Park | $480 |
| Offramp and overpass from I- 57 outside of Marion and necessary connector roads. | $4,000 |
| For Plainfield Township Park District to construct DuPage River Bike and Pedestrian Trail linking Grand Illinois, Midewin, and I&M Canal Trails | $80 |
| Washington Street Widening, Gurnee | $2,688 |
| Improve Roads and Bridges, Cicero | $1,200 |
| Project is a stand-alone roadway improvement consisting of the complete reconstruction of the roadway, The Village of Forest Park. | $800 |
| Upgrade County Highways 18 and 22 in conjunction with State I-57 interchange plan north of Mattoon. | $1,600 |
| Construct I-57 Bridge Overpass, City of Markham. | $480 |
| City of Springfield, IL for improvements to Cockrell Lane | $762 |
| Construct access roads to National Great Rivers Research Center. | $1,000 |
| Construct Roadway from Mississippi River Barge Dock to IL Rt. 3-IL Rt. 157, Cahokia | $1,600 |
| Construction of highway approaches to the Sullivan Road bridge in Aurora, IL. | $1,280 |
| Engineering and construction of 15.1 mile Alliance trail between Lock 14 in LaSalle and Lock 2 in Bureau Junction. | $800 |
| To construct Veterans Memorial Drive Extension. Will link Mount Vernon on the east side of I-57 with incorporated area lying west | $800 |
| Construction of Eldamain Road over the Fox River. | $4,000 |
| Replace Interstate 74 Bridge, Moline | $3,200 |
| Construction of an Extension of Atkinson Road to Intersect with IL 120 and IL 137 | $4,800 |
| Undertake Traffic Mitigation and Circulation Enhancements on 57th and Lake Shore Drive, Chicago. | $1,600 |
| For the construction of a highway on new alignment to create a cross town route across Godfrey | $1,400 |
| Resurface Shawnee College Road, Pulaski County | $1,261 |
| For Cook County to reconstruct and widen 127th Street between Smith Road and State Street in Lemont | $360 |
| Construct bike/pedestrian paths, Chicago | $2,480 |
| Construct Leon Pass overpass, Hodgkins | $768 |
| Undertake Streetscaping project on Harlem Avenue initiating from 71st Street to I-80, Cook County | $3,280 |
| Construct bike path, parking facility, and related transportation enhancement projects, North Riverside. | $1,920 |
| Upgrade Roads, Summit | $768 |
| Undertake streetscaping on Ridgeland Avenue, Oak Park Avenue, and 26th Street, Berwyn | $768 |
| Construct bike/pedestrian paths, facilities and infrastructure improvements in Spring Rock Park, Western Springs Park District. | $576 |
| Upgrade roads, Plainfield | $240 |
| Upgrade 31st Street and Golfview Rd. intersection and construct parking facilities, Brookfield | $1,200 |
| Construct Rt. 3 Loop Hog Hollow Road to Monsanto Road, St. Clair County | $600 |
| Reconstruction and Improvement of North Lincoln Ave, O'Fallon. | $1,340 |
| Reconstruction of 20th Street, Granite City | $1,200 |
| Road Alignment from Caseyville Road to Sullivan Drive, Swansea. | $900 |
| State Rt. 78 to Lathrop Street to 2900 E (Township Road)--A 1.5 mile village street extension, bridges, and upgrading of existing street | $1,840 |
| Bloomington-Normal East Side Highway Corridor. | $800 |
| Construct extension of U.S. 51 from .9 miles south of Moweaqua to 4.6 miles south of Moweaqua. | $5,000 |
| Construction of Galena and Freeport bypasses, U.S. 20 | $5,000 |
| Widen U.S. 30, Fulton-Rock Falls (Morrison), Whiteside County | $2,250 |
| Construction of 11th Street Extension, Springfield | $6,000 |
| Construction of Capital Avenue Project, 7th--11th Streets, Springfield | $4,000 |
| Design, land acquisition, and construction of West State St. (US Business 20) from Meridian Rd. to Rockton Ave. in Rockford | $5,000 |
| To conduct study of U.S. 67 bridge over Illinois River, Beardstown. | $4,000 |
| Construction to improve access of Interstate 57/ 64, Mount Vernon | $2,000 |
| Expand U.S. 67, Brighton to Bunker Hill Road, Macoupin County | $1,000 |
| Improvements to Harrison Street, Quincy | $1,500 |
| Construction of Joliet Arsenal Road improvements, Will County. | $2,000 |
| Continue expansion of IL 336, Macomb-Peoria | $2,000 |
| Construct I-290, The Village of Oak Park. | $2,000 |
| Improve U.S. Route 34 from Kewanee to Kentville Road. | $500 |
| Construction of IL Route 31--Algonquin Bypass to Rakow Road | $3,000 |
| Road improvements in Elmwood Park, Franklin Park, Northlake, Oak Park, River Forest, River Grove, and Stone Park | $1,000 |
| Bourbonnais road improvements, Bourbonnais. | $1,500 |
| Bayview Bridge improvements, Adams County | $250 |
| Improvements to Maple/ Manteno Lake Road, Manteno | $1,000 |
| Replace Interstate 74 Bridge, Moline | $1,500 |
| Constitution Trail Extension--Grove Street south to Lafayette Street, Bloomington. | $750 |
| Improve transportation accessibility at Chicago Botanic Garden, Glencoe. | $1,500 |
| Loyola University-Chicago vehicular-pedestrian right- of-way, Chicago. | $750 |
| Construct extension of Route 3 from Loop Hog Hollow Road to Monsanto Road, Cahokia/Sauget | $1,500 |
| Engineering, Preconstruction and Construction of North- South Wacker Drive, Chicago. | $10,000 |
| Upgrade Roads, Summit | $750 |
| Widen U.S. Highway 30 in Whiteside County | $2,200 |
| For the construction of the Grand Avenue Underpass, Village of Franklin Park | $1,000 |
| Illinois 31 Roadway improvements, Algonquin Bypass--Rakow Road | $7,000 |
| Road improvements associated with Diversatech Campus, Manteno. | $700 |
| Upgrade Veterans Drive in Pekin Illinois | $4,000 |
| Street Resurfacing, City of Centreville. | $500 |
| Design, land acquisition, and construction of South Main Street (IL 2) Corridor from Beltline Road to Cedar Street in Rockford | $5,000 |
| Preconstruction and construction activities for U.S. 51. | $7,500 |
| Construct I-290, The Village of Oak Park. | $2,000 |
| Mitchell Road to Farnsworth Avenue improvements, Aurora | $2,500 |
| Preconstruction and construction, East New York Street, Aurora. | $3,000 |
| Improve Great River Road, Mercer County. | $500 |
| Improve Great River Road, Warsaw | $250 |
| Undertake traffic mitigation and circulation enhancements on 57th and Lakeshore Drive, Chicago | $1,200 |
| Upgrade 31st Street and Golfview Road intersection and construct parking facilities, Brookfield | $1,000 |
| Phase II Road Construction, Outer Belt West, Effingham | $1,500 |
| Construct four lane extension of IL Rt. 29 from Rochester to Taylorville. | $1,000 |
| Preconstruction and construction activities on U.S. 67 from Macomb to Alton. | $7,000 |
| Preconstruction and construction activities on U.S. 34 from Monmouth to Plano. | $5,000 |
| Improve Lightfoot Road, City of Farmington | $500 |
| Pioneer Parkway improvements, Peoria | $1,000 |
| Transportation enhancements and road improvements necessary for Downtown Plaza improvements in Jacksonville | $1,000 |
| City of Havana, Illinois upgrades to Broadway Street | $500 |
| Improvements to County Highway One, Calhoun County | $1,000 |
| Resurfacing of East Main Street in Staunton, Macoupin County. | $500 |
| Bike trail extension for the Kankakee River Trail Project, Kankakee. | $400 |
| Improve Highway-Railroad Crossings, Galesburg | $500 |
| Improvements to township roads in Shawnee National Forest, Pope County. | $500 |
| Associated improvements for the Intersection of IL 13 and 37, Marion | $500 |
| Construction of 11th Street Extension in Springfield | $800 |
| Widen U.S. 30 in Whiteside County | $550 |
| Upgrade 31st Street and Golfview Road and construct parking facilities in Brookfield | $1,000 |
| Bayview Bridge improvements in Adams County. | $250 |
| Preconstruction and construction of IL 13 connector in Harrisburg. | $2,000 |
| Expansion of U.S. 67 from Brighton to Bunker Hill Road in Macoupin County. | $1,000 |
| Loyola University-Chicago vehicular-pedestrian right- of-way in Chicago. | $250 |
| Constitution Trail Extension (Grove Street south to Lafayette Street) in Bloomington | $250 |
| Improvements to 11th Avenue streetscape, campus trails and bridges at Augustana College in Rock Island | $1,500 |
| Improvements to Oakland, Main Street, Elderado and Fairview, streetscape in the vicinity of Millikin University, Decatur. | $1,500 |
| The extension of MacArthur Boulevard from Wabash to Iron Bridge Road in Springfield. | $2,000 |
| Restoration of the historic railroad depot and intermodal in Mattoon. | $1,200 |
| Construct overpass, U.S. 40 to Southwest Andrews Drive in Greenville. | $1,000 |
| Improvements to Cockrell Lane in the City of Springfield. | $1,200 |
| Construct extension of Route 3 from Loop Hog Hollow Road to Monsanto Road in Cahokia/Sauget | $500 |
| Preconstruction and construction activities of U.S. 51 between Decatur and Vandalia | $7,500 |
| Preconstruction and construction of North-South Wacker Drive in Chicago | $15,000 |
| Construct new Mississippi River Bridge and related roads in the vicinity of East St. Louis | $14,000 |
| Replace I-74 Bridge in Quad Cities (Moline) | $3,500 |
| Conduct study of U.S. 67 bridge over Illinois River in Beardstown | $2,000 |
| Improvements to the intersection of IL 13 and 37 in Marion | $1,000 |
| Construction to improve access of Interstate 57/64 in Mount Vernon | $2,000 |
| Construction of Joliet Arsenal Road Improvements in Will County | $1,000 |
| Continue expansion of IL 336 in Macomb-Peoria | $2,000 |
| Preconstruction and construction of IL 13 Connector in Harrisburg | $2,000 |
| Construction of O'Hare Bypass/Elgin O'Hare Extension | $140,000 |
| CREATE | $100,000 |
| Mississippi River Bridge and related roads | $150,000 |
| Construction of the U.S. I-80 to I-88 North-South Connector in Illinois | $152,000 |
| Construction of Route 34 Interchange and improvements in Illinois | $55,000 |
| Planning, design, right-of-way acquisition and construction of the Interstate Route 74 bridge from Bettendorf, Iowa, to Moline, Illinois | $15,000 |
| "Chicago, IL Construct intermodal facility at 35th Street at Metra Ride Line (Northside)" | $4,180 |
| "Chicago, IL Feasibility Study for intermodal station on the Metra Rock Island near Kennedy-King College " | $251 |
| "Geneva, Illinois-Construct commuter parking deck for Metra Service " | $3,344 |
| "Joliet, Illinois-Union Station commuter parking facility " | $2,404 |
| "St. Charles, IL-Intermodal Parking Structures " | $3,762 |
| "Village of Tinley Park, Illinois, 80th Avenue Commuter Rail Station reconstruction and site enhancements " | $669 |
| "Centralia, Illinois-South Central Mass Transit District Improvements " | $334 |
| "Champaign, IL-Construct park and ride lot with attached daycare facility" | $1,254 |
| "Elgin to Rockford, Illinois-Intermodal stations along planned Metra Union Pacific West Line extension alignment, including necessary alternatives analysis " | $418 |
| "Maywood, IL Purchase buses " | $42 |
| "Normal, Illnois-Multimodal Transportation Center" | $1,672 |
| "Normal, Illnois-Multimodal Transportation Center, including facilities for adjacent public and nonprofit uses " | $4,180 |
| "Wheaton, IL Pace Suburban Bus-Purchase buses " | $836 |
| Mattoon. Illinois -- historic railroad depot restoration/intermodal center | $1,338 |
| "Rock Island, IL Improve Rock Island Mass Transit District Bus Facility " | $418 |
| "Rock Island, Illinois, Metrolink Transit Maintenance Facility " | $1,250 |
| "Springfield, IL, Multimodal Transit Terminal" | $5,000 |
| "Chicago, IL, Cermak Road, Bus Rapid Transit " | $1,250 |
| "Cicero, Chicago Establish Transit Signal Priority, Cicero Ave., Pace Suburban Bus" | $836 |
| "Des Plaines, Wauconda, Cook and Lake Counties, IL Rand Road Transit Signal Priority" | $669 |
| "Pace Suburban Bus, IL South Suburban BRT Mobility Network " | $418 |