| Construct safe access to streets for bicyclists and pedestrians including crosswalks, sidewalks and traffic calming measures, Covina | $400 |
| Develop and implement ITS master plan in Anaheim | $800 |
| Builds a pedestrian bridge from Hiller Street to the Bay Trail, Belmont | $1,960 |
| Reconstruct and deep-lift asphalt on various roads throughout the district in Santa Barbara County | $4,000 |
| Huntington Beach, Remove off-ramp on I'405 at Beach Blvd. Construct fourth lane on I'405 North, at the Beach Blvd. interchange | $400 |
| Replace structurally unsafe Winters Bridge for vehicles, bicycles and pedestrians between Yolo and Solano Counties | $1,600 |
| Roadway surface improvements, street lighting, and storm drain improvements to South Center Street from Baughman Road to State Route 78/86, Westmorland | $640 |
| Douglas St. Improvements, El Segundo | $3,200 |
| Route 1 San Pedro Creek Bridge replacement in Pacifica | $2,500 |
| Adams Street Rehabilitation Project, Glendale | $310 |
| San Diego River Multiuse Bicycle and Pedestrian Path | $400 |
| Willow and Herndon Traffic Flow Improvements, City of Clovis, California | $240 |
| Will add landscaping enhancements along the Ronald Reagan Freeway Route 118 for aesthetic purposes | $2,320 |
| Improvement of intersection at Balboa Blvd. and San Fernando Rd | $400 |
| State Route 86S and Ave. 66 highway safety grade separation | $3,600 |
| Construct pedestrian, bicycle and ADA accessible boardwalks at the Pismo Beach Promenade in San Luis Obispo County | $240 |
| Implement streetscape improvements on segments of Laurel Canyon Blvd. and Victory Blvd. in North Hollywood | $960 |
| Reconstruct segments of Hollister Avenue between San Antonio Road and State Route 154 in Santa Barbara County | $2,000 |
| Construct a 2.8 mile bikeway along Lambert Road from Mills Ave., to Valley Home Ave., in the City of Whittier, CA | $2,000 |
| Construction of Cross Valley Connector between I'5 and SR 14 | $4,000 |
| Soundwall construction on the 210 Freeway, Pasadena | $1,440 |
| Widen SR 89 at existing mousehole two lane RR underpass | $2,828 |
| Operations and management improvements, including ITS technologies, on U.S. Highway 101 in Santa Barbara County | $800 |
| Quincy-Oroville Highway Rehabilitation in Plumas County | $800 |
| Construct Coyote Creek Trail Project from Story Road to Montague Expressway in San Jose | $2,000 |
| Escondido, CA Construction of Bear Valley Parkway, East Valley Parkway | $1,600 |
| Reconstruct I'710 southern terminus off ramps, Long Beach | $2,400 |
| Widening the highway and reconstructing off ramps on Hwy 101 between Steele Lane and Windsor, CA to reduce traffic and promote carpools | $5,600 |
| Implement Southwest San Fernando Valley Road and Safety Improvements | $1,840 |
| Rehabilitation, repair, and/or reconstruction of deficient 2-lane roads that connect to Interstate 5, SR 180, SR 41 and SR 99 countywide, Fresno County | $2,800 |
| Study of Thomas Bridge to meet future cargo and passenger traffic needs of the ports of Long Beach and Los Angeles | $1,600 |
| Mount Vernon Avenue grade separation and bridge expansion in Colton | $1,600 |
| Streetscape improvements at East 14th St-Mission Blvd. in Alameda County | $600 |
| Construct one additional all purpose lane in each direction on I'405 and provide additional capital improvements from SR 73 through the LA County line | $2,568 |
| Improve traffic safety, including streetlights, from Queen to Barclay to Los Angeles River to Riverside in Elysian Valley, Los Angeles | $1,120 |
| Construct a raised landscaped median on Alondra Blvd. between Clark Ave. and Woodruff Ave. in Bellflower | $320 |
| Construct interchange on U.S. 50 at Empire Ranch Road in Folsom | $1,440 |
| Santa Anita Avenue Corridor Improvement project, Arcadia, California | $2,400 |
| Road widening, construct bike path, lighting, and safety improvements on road leading to Hansen Dam Recreation Area, Los Angeles | $5,200 |
| Construct new left turn lane at State Route 19 and Telstar in El Monte | $560 |
| Reconstruct I'880 and Coleman Avenue Interchange and implement other I'880 Corridor operational improvements in Santa Clara County | $8,000 |
| Construct Class I bike and pedestrian path from San Luis Obispo to Avila Beach | $320 |
| Construction of a traffic signal at the intersection of Independence Avenue and Sherman Way | $100 |
| I'10 and Indian Ave. Interchange, Palm Springs, CA | $2,200 |
| Complete the Bay Trail along the western edge of the American Canyon Wetlands Edge Bay Trail | $800 |
| Folsom Blvd. Transportation Enhancements, City of Rancho Cordova | $5,600 |
| Implement streetscape project on Central Avenue from 103rd Street to Watts/103rd Street Station, Watts | $3,200 |
| Seismic retrofit of the Golden Gate Bridge | $8,800 |
| Upgrade and extend Commerce Avenue, City of Concord | $1,600 |
| Conduct project design and environmental analysis of Heritage Bridge on Heritage Road linking Chula Vista to Otay Mesa | $2,800 |
| I'5 Santa Clarita-Los Angeles Gateway Improvement Project | $1,600 |
| San Gabriel Blvd. Rehabilitation Project'Mission Rd. to Broadway, San Gabriel | $240 |
| Widen Firestone Blvd. between Ryerson Blvd. and Stewart and Gray Road in Downey | $1,600 |
| Construct Air Cargo Access Road to Oakland International Airport | $720 |
| Widen Lakewood Blvd. between Telegraph Rd. and Fifth St. in Downey | $1,600 |
| Pasadena Ave/Monterey Rd. Partial Grade Separation'Preliminary Engineering'Feasibility, South Pasadena | $240 |
| Mariposa County, CA Improve 16 roads, bridge and one bike path | $2,800 |
| Scenic preservation and run-off mitigation in the Santa Monica Mountains National Recreation Area near PCH and U.S. 101 | $1,200 |
| Mission Boulevard/State Route 71 Interchange'Corridor Improvements | $3,360 |
| Carlsbad, CA Construction of Poinsettia Lane | $1,600 |
| Construct pedestrian enhancements on Broadway in Los Angeles | $2,000 |
| Construct Route 101 Auxiliary Lanes 3rd Ave. in the City of San Mateo to Millbrae Ave. in Millbrae | $3,000 |
| Undertake Cordelia Hill Sky Valley transportation enhancement project, including upgrade of pedestrian and bicycle corridors, Solano County | $2,400 |
| Rehabilitate street surface of Cedros Avenue between Burbank Blvd. and Magnolia Blvd | $34 |
| Improvement of intersection at Aviation Blvd. and Rosecrans Ave. to reduce congestion, City of Hawthorne | $2,000 |
| I'5 HOV Improvements from Route 134 to Route 170 | $400 |
| Shoal Creek Pedestrian Bridge (San Diego) | $1,200 |
| Construct I'605 Interchange Capacity Improvements in Irwindale | $1,600 |
| Tuolumne, Stanislaus and Merced Counties Upgrade existing county highway, J59 | $2,000 |
| Diamond Bar On-Off Ramp at Lemon Ave. on SR 60 | $9,600 |
| Reconstruct interchange for south-bound traffic entering I'80 from Central Avenue, City of Richmond | $3,120 |
| Reduce Orange County Congestion Program | $200 |
| Street Closure at Chevy Chase Drive, Glendale | $640 |
| Grade Separation at 32nd Street between I'15 and Harbor Drive, San Diego | $800 |
| Begin construction of road from U.S. 395 west towards SR 14 | $800 |
| Widen Wilmington Ave. from 223rd street including ramp modifications, Carson | $4,000 |
| Develop and implement traffic calming measures for traffic exiting the I'710 into Long Beach | $1,600 |
| San Diego, CA Construction of the I'5 and SR 56 Connectors | $6,400 |
| Bay Road improvements between University Avenue to Fordham, and from Clarke Avenue to Cooley Landing. Northern access improvements between University and Illinois Avenues, East Palo Alto | $4,800 |
| Construct bicycle and pedestrian bridge between Oyster Bay Regional Park in San Leandro and Metropolitan Golf Course in Oakland | $600 |
| The Alameda Corridor SR 47 Port Access Expressway design funding | $8,000 |
| Conduct a Project Study Report for new Highway 99 interchange between SR 165 and Bradbury Road, serving Turlock/Hilmar region | $400 |
| State Route 1 improvements between Soquel and Morrissey Blvd. including merge lanes and the La Fonda overpass, Santa Cruz | $2,936 |
| Grade Separation at Vanowen and Cliveborne, Burbank | $800 |
| Riverside Drive Improvements, Los Angeles | $320 |
| Upgrade CA SR 4 East from the vicinity of Loveridge Road to G Street, Contra Costa County | $16,000 |
| Design and environmental analysis for State Route 11 connecting State Route 905 to the new East Otay Mesa Port of Entry, San Diego | $800 |
| Replace I'880 overpass at Davis St. in San Leandro | $600 |
| Construct Inland Empire Transportation Management Center in Fontana to better regulate traffic and dispatch personnel to incidents | $1,200 |
| Implement Riverside Avenue Railroad Bridge improvements, south of Interstate 10 in Rialto | $400 |
| Planning, design, engineering, and construction of Naval Air Station, North Island access tunnel on SR 75-282 corridor, San Diego. | $4,000 |
| Construct road from Mace Blvd. in Yolo County to federally supported Pacific Flyway wildlife area | $800 |
| North Atlantic Pedestrian Bridge, Monterey Park. | $480 |
| Reconstruct Eastern Ave. from Muller St. to Watcher St. in Bell Gardens. | $800 |
| Design Traffic Flow Improvements Azusa and Amar, City of West Covina. | $1,000 |
| Rosemead Boulevard/Highway 19 Renovation Project, Pico Rivera. | $80 |
| Colima Road at Fullerton Road Intersection Improvements | $800 |
| Widening Avenue 416 in Dinuba California. | $1,200 |
| Construct highway connecting State Route 78/ 86 and State Route 111, Brawley. | $7,600 |
| Rehabilitate street surfaces in Sherman Oaks | $99 |
| Repair and realignment of Brahma Drive and Winnetka Ave. | $240 |
| U.S. 101 Operational Improvements, San Jose | $4,000 |
| Widen Interstate 8 overpass at Dogwood Road, Imperial County | $1,698 |
| Improve bridge 58-7 on SR 115 that crosses the Alamo River in Holtville and also project design and environmental analysis of a new bridge over the same river. | $800 |
| Construct a new interchange where I-15 meets Cajalco Road in Corona, CA | $8,000 |
| Construction of CA 101 Auxiliary Lanes, Marsh Rd. to Santa Clara County Line | $1,800 |
| Realign First St. between Mission Rd. and Clarence St. in Los Angeles | $1,000 |
| Construct overpass on Central Ave. at the railroad crossing in Newark | $600 |
| Implement Van Nuys Road and Safety Improvements. | $400 |
| Widen State Route 98, including storm drain developments, from Kloke Road to State Route 111, Calexico | $2,400 |
| Widen State Route 98 from Route 111 to State Route 7, Calexico. | $4,000 |
| Widen State Route 46 between Airport Road and the Shandon Rest Stop in San Luis Obispo County | $33,461 |
| Widen State Route 262, replace two railroad overpass structures, and rebuild on and off ramps between SR 262 and Kato Rd. in Fremont | $3,200 |
| Widen SR 12 to four lanes through Jamieson Canyon (between I-80 and SR 29) for safety concerns and economic growth. | $6,400 |
| Widen South Main St.-Soda Bay Rd. between CR 400A (mile marker 0.0-mile marker 0.7) and CR 502 (mile marker 0.0 and 0.9). | $3,200 |
| Widen Santa Maria River Bridge on U.S. Highway 101 between Santa Barbara County and San Luis Obispo County | $2,720 |
| Widen San Fernando Road North, including streetscape projects, Sylmar | $848 |
| Improvements to State Route 67/State Route 52 interchange. | $4,000 |
| Construct Valley Boulevard Drainage Improvements, El Monte. | $600 |
| Implement intelligent management and logistics measures to improve freight movement, Gateway Cities | $2,400 |
| Los Angeles Regional Diesel Emissions Reduction Program For Engine Retrofit, Gateway Cities | $400 |
| Study and construct highway alternatives between Orange and Riverside Counties, directed by the Riverside Orange Corridor Authority working with local government agencies, local transp. authorities, and guided by the current MIS | $3,200 |
| Fresno County, CA Widen Friant Road to four lanes with class II bicycle lanes. | $1,200 |
| Improvement of intersection at Burbank Blvd. and Woodley Ave. | $128 |
| Golden Gate National Parks Conservancy--Plan and Implement Trails and Bikeways Plan for the Golden Gate National Recreation Area and Presidio | $5,000 |
| Upgrade and reconstruct I- 580/Vasco Road Interchange, City of Livermore. | $2,000 |
| Improve the Rosecrans Ave. and Alondra Blvd. bridges over the San Gabriel River in Bellflower. | $40 |
| Modesto, Riverbank and Oakdale, CA Improve SR 219 to 4-lanes | $1,600 |
| I-15/Base Line Road Interchange Project, Rancho Cucamonga, California | $4,000 |
| Complete Monterey Bay Sanctuary Scenic Trail between Monterey and Santa Cruz counties. | $5,800 |
| Central Galt and State Route 99 Interchange and Access Improvements. | $2,400 |
| Establish new grade separation at Sunset Ave. in Banning | $1,600 |
| Upgrade Bellflower intersections at Alondra Blvd. and at Rosecrans Ave. in Bellflower | $280 |
| Rehabilitate pavement on Azusa Avenue and San Gabriel Avenue in Azusa. | $400 |
| South Bay Cities COG Coastal Corridor Transportation Initiative, Phase 3, El Segundo. | $1,600 |
| Long Beach Intelligent Transportation System: Integrate functioning traffic management center that includes the port, transit, airport as well as the city's police and fire departments, Long Beach. | $2,400 |
| Almaden Expressway Improvements between Branham Lane and Blossom Road, San Jose | $2,800 |
| Construct sound barriers at the I-805/SR 54 Interchange, National City | $680 |
| Widen and Improve County Line Road in Calimesa. | $1,600 |
| Compton Arterial Reconstruction and Improvement Program, Compton. | $3,200 |
| Construct new interchange and related road improvements on U.S. 101 near Airport Blvd., Salinas. | $1,936 |
| Construction of new freeway between I-15 and U.S. 395, including new interchange at I-15. | $4,000 |
| Coyote Creek Trail Project-- Story Road to Montague Expressway | $2,000 |
| Modify I-880 and Stevens Creek Boulevard Interchange to ease traffic congestion in San Jose | $9,600 |
| Palm Drive and Interstate 10 interchange project | $2,200 |
| Construct I-580 Interchange Improvements in Castro Valley | $960 |
| Reconstruct interchange at I-10 and Riverside Avenue to improve traffic in Rialto | $1,600 |
| Reconstruct Bloomfield Ave. with medians from Carson St. to north city limits in Hawaiian Gardens. | $320 |
| Reconstruct Paramount Blvd. with medians and improve drainage from Artesia Blvd. to Candlewood St. in Long Beach | $480 |
| Reconstruct Long Beach Blvd. with medians and improve drainage from Palm Ave. to Tweedy Blvd. in Lynwood. | $2,400 |
| Expand carsharing pilot program to serve low-and moderate-income neighborhoods in the City and County of San Francisco. | $1,600 |
| Construct Traffic flow improvements Vincent and Lakes Drive, West Covina | $600 |
| Construction of a Lincoln Bypass on SR 65 in Placer County, CA | $2,400 |
| Rio Vista Bridge Realignment Study and Street Sign Safety Program | $560 |
| Development and construction of improvements to State Route 79 in the San Jacinto Valley | $2,400 |
| Alameda Corridor-East Construction Authority, San Gabriel Valley | $240 |
| Reconfigure San Fernando Road from Fletcher Drive to I-5 Fwy, Los Angeles. | $5,160 |
| Construct truck lane on Keystone Road from State Route 111 to Austin Road, Imperial County. | $2,000 |
| Construction of new roadway lighting on major transportation corridors in the Southwest San Fernando Valley. | $800 |
| Freeway 180 Improvements Fresno | $7,600 |
| Construction of a smart crosswalk system at the intersection of Arminta St. and Mason Ave. | $40 |
| Improve I-8 off ramp at Ocotillo to the Imperial Valley College Desert Museum/Regional Traveler Visitor Center, Imperial County | $800 |
| Install new grade separation at Ranchero Road in Hesperia | $4,000 |
| Add turn lane and adaptive traffic control system at intersection of San Tomas Expressway and Hamilton Avenue in Campbell | $1,280 |
| Interchange improvements at Rice Avenue and U.S. Highway 101 in the City of Oxnard | $2,640 |
| San Gabriel Blvd. Intersection Improvements at Broadway and at Las Tunas, San Gabriel | $160 |
| Interstate 15 and State Route 79 South Freeway Interchange and Ramp Improvement Project. | $1,600 |
| Transportation enhancements to Children's Museum of Los Angeles. | $960 |
| Project design, environmental assessment, and roadway construction of Lonestar Road from Alta Road to Enrico Fermi Drive San Diego County | $400 |
| Project Study Reports for I- 105 and I-405 Interchanges at Los Angeles International Airport. | $320 |
| Reconstruct Whittier Blvd. and improve parkway drainage from Philadelphia Ave. to Five Points in Whittier | $1,360 |
| Conduct project report study on Old River School Rd--Firestone Blvd. intersection re- configuration. | $400 |
| Resurface and construct truck lane at CA Hwy 94 and I-8 interchange, Boulevard. | $2,400 |
| Engineering, right-of-way and construction of HOV lanes on I-580 in the Livermore Valley, California | $9,600 |
| Landscape south side of the 91 Fwy at Bellflower Blvd. in Bellflower. | $200 |
| City of Redondo Beach Esplanade Improvement Project. | $800 |
| Conduct Study of SR 130 Realignment Project, San Joaquin County and Santa Clara County, CA | $1,600 |
| Passons Grade Separation in the City of Pico Rivera. | $2,960 |
| Implement Grove Avenue Corridor I-10 interchange improvements in Ontario. | $2,400 |
| Reconstruction of The Strand in the City of Manhattan Beach to improve beach access and accommodate increased pedestrian traffic | $1,600 |
| Construction of new roadway lighting on major transportation corridors in the Northeast San Fernando Valley. | $400 |
| Rehabilitation of Tulare County Farm to Market road system | $3,200 |
| Implement Northeast San Fernando Valley Road and Safety Improvements. | $160 |
| State Route 88--Pine Grove Corridor Improvement Project. | $400 |
| Construct earthen berm along Esperanza Road from Yorba Linda Blvd. to the west city limits to mitigate noise | $1,600 |
| Construct I-80 Gilman Street interchange improvements in Berkeley | $1,200 |
| Highways 152-156 Intersection improvements, CA | $800 |
| Construct Hwy 101 bicycle- pedestrian project in Marin and Sonoma Counties from north of Atherton Ave. to south of Petaluma River bridge | $400 |
| Extension of a regional Class I bikeway from the West City limits to the East City limits along leased railroad right-of- way. | $320 |
| Construct full-access interchange at SR 120-- McKinley Avenue, with the necessary SR 120 auxiliary lanes, Manteca, CA | $3,200 |
| Install emergency vehicle preemption equipment along major arterials in the I- 880 corridor, Alameda County | $400 |
| Conduct Study and Construct I-205 Chrisman Road Interchange Project, Tracy, CA. | $800 |
| Construction of Campus Parkway from State Route 99 to Yosemite Ave., Merced County. | $400 |
| Reconfigure intersection at Highways 152 and 156 in Santa Clara County | $11,120 |
| Upgrade and reconstruct the I-80/I-680/SR 12 Interchange, Solano County | $17,480 |
| Improvement of intersection at Burbank Blvd. and Hayvenhurst Ave. | $320 |
| Construct an Interchange on Highway 70 at Georgia Pacific Road in Oroville | $2,028 |
| City of Madera, CA Improve SR 99--SR 145 Interchange. | $2,400 |
| Ramona Avenue Grade Separation, Montclair, California | $1,600 |
| Construction of a smart crosswalk system at the intersection of Topanga Canyon Blvd. and Gault St. | $40 |
| Planning for Orange Line Mag Lev from downtown Los Angeles to central Orange County | $280 |
| Randolph St. improvements between Wilmington Ave. and Fishburn Ave. in Huntington Park. | $960 |
| Reconstruct Azusa Ave. and San Gabriel Ave. for 2-way traffic in Azusa | $2,000 |
| Construct and improve medians and drainage on Imperial Highway from west border to east border of city in La Mirada. | $1,360 |
| Reconstruct and widen Del Amo Blvd. to four lanes between Normandie Ave. and New Hampshire Ave., Los Angeles County | $2,400 |
| Conduct study and construct CA State Route 239 from State Route 4 in Brentwood area to I-205 in Tracy area | $4,000 |
| Construct two right hand turn for Byzantine Latino Quarter transit plazas at Normandie and Pico, and Hoover and Pico, Los Angeles. | $400 |
| El Camino Real Grand Blvd. Initiative in San Mateo County | $3,000 |
| Construct Guadalupe River Trail from I-880 to Highway 237 in Santa Clara County | $6,400 |
| Improvements to U.S. 101 ramps between Winnetka Ave. and Van Nuys Blvd | $320 |
| Pine Avenue extension from Route 71 to Euclid Avenue in the City of Chino, California | $6,800 |
| The Foothill South Project, construct 16 miles of a six-lane limited access highway system | $8,000 |
| State Route 99 improvements at Sheldon Road. | $3,200 |
| Construct the Silicon Valley Transportation Incident Management Center in San Jose. | $6,400 |
| Design and Construction Camino Tassajara Crown Canyon to East Town Project, Danville, CA. | $800 |
| Realignment of La Brea Avenue to reduce congestion, City of Inglewood. | $2,640 |
| Project to evaluate air quality and congestion mitigation benefits of a Hybrid Utility Vehicle in Santa Barbara County | $80 |
| Improve interstates and roads part of the Inland Empire Goods Movement Gateway project in and around the former Norton Air Force Base | $20,000 |
| Construction of an interchange at Lammers Road and I-205, Tracy, CA. | $800 |
| Complete the engineering design and acquire the right-of-way needed for the Arch-Sperry project in San Joaquin County | $4,000 |
| Reduce congestion and boost economies through safer access to the coast by realigning Hwy 299 between Trinity and Shasta Counties | $5,600 |
| Construct Alviso Bay Trail from Gold Street in historic Alviso to San Tomas Aquino Creek in San Jose | $800 |
| Vasco Road Safety Improvements, Contra Costa Transportation Authority and the County of Alameda Public Works, California | $800 |
| Route 198 Expansion, from SR 99 to SR 43 | $2,400 |
| Construct grade separation on State College Blvd. at the Burlington Northern Santa Fe railroad, Fullerton. | $12,800 |
| Construct operational and safety improvements to I- 880 N at 29th Ave. in Oakland. | $2,000 |
| Construction of new roadway lighting on major transportation corridors in the Northwest San Fernando Valley. | $800 |
| Replace SR 22 interchanges, construct HOV lanes, and lengthen bridges in Garden Grove. | $5,200 |
| Design and construct new interchange at Potrero Blvd. and State Route 60 in Beaumont. | $1,600 |
| Crenshaw Blvd. Rehabilitation, 182nd St. 190th St.; and Crenshaw Blvd. at 182nd St. Fwy on- off Ramp Capacity Enhancement, City of Torrance | $640 |
| Construct Interchange at Intersection of SR 44 and Stillwater Road. | $4,000 |
| Construct truck lane on Baughman Road from State Route 78/86 to Forrester Road, Westmorland. | $440 |
| Oregon-Page Mill expressway Improvements between U.S. 101 and SR 82, Palo Alto | $3,200 |
| Park Boulevard-Harbor Drive Rail Grade Separation, San Diego. | $800 |
| Construct road surface improvements, and improve road safety from Brawley Water plant to Hwy 86 to 9th Street to 18th Street, Brawley. | $1,120 |
| Alameda Corridor East Gateway to America Trade Corridor Project, Highway- Railgrade separation along 35 mile corridor from Alameda Corridor (Hobart Junction) to Los Angeles/ San Bernardino County Line | $12,400 |
| Construction of traffic and pedestrian safety improvements in Yucca Valley | $1,600 |
| 710 Freeway Study to Evaluate Technical Feasibility and Impacts of a Tunnel Alternative to Close 710 Freeway Gap. | $2,400 |
| Greenleaf right-of-way Community Enhancement Project-design and construct bikeways, pedestrian walkways and upgrade signalization, Compton. | $3,200 |
| Avalon Boulevard/I-405 Interchange modification project, Carson. | $4,800 |
| Construct I-80 HOV lanes and interchange in Vallejo | $800 |
| 4 lane widening/safety improvements on State Route 25 from Hollister to Gilroy | $2,928 |
| Interstate 15 and Winchester Road Interchange Project. | $1,600 |
| U.S. 101 Corridor Improvements--Route 280 to the Capitol-Yerba Buena Interchange. | $4,000 |
| Rancho Vista Blvd. Widening Project. | $2,800 |
| Monte Vista Avenue Grade Separation, Montclair, California | $1,600 |
| Construct safe routes to school in Cherryland and Ashland. | $800 |
| Install Central Ave. Historic Corridor comprehensive streetscape improvements thus improving traffic, ped safety, and economic development, Los Angeles | $1,656 |
| Reconstruct Paramount Blvd. with medians and improve drainage from north border to south border of city in Lakewood | $1,080 |
| Widen and make ITS improvements on Paramount Blvd. between Telegraph Rd. and Gardendale St. in Downey | $800 |
| Widen California State Route 132 from California State Route 99 west to Dakota Avenue. | $14,400 |
| Widen Haskell Avenue between Chase St. and Roscoe Blvd. | $160 |
| Construct and repair lining in four tunnels on Kanan, Kanan Dume, and Malibu Canyon Roads between U.S. 1 and U.S. 101 | $2,400 |
| Construct truck ramp linking Interstate 5 to the National City Marine Cargo Terminal, National City | $2,400 |
| Upgrade first responders signal pre-emption hardware, Culver City. | $26 |
| Improve I-8 off ramp to the Desert Farming Institute, Imperial County. | $800 |
| Construct fourth bore of Caldecott Tunnel on SR 24, California | $1,600 |
| Make traffic and safety improvements to Atlantic Blvd. in Maywood | $400 |
| Las Tunas Drive Pedestrian Enhancement, San Gabriel | $120 |
| Improve access to I-80 at Eureka Road Interchange. | $1,600 |
| Interstate 15, California Oaks Road Interchange Project. | $1,600 |
| Acquire lands for mitigation adjacent to U.S. 101 as part of Southern Santa Clara County Wildlife Corridor Protection and Scenic Enhancement Project. | $400 |
| U.S. 395 Realignment and Widening Project | $400 |
| Implement San Francisco Street Improvements Program. | $6,400 |
| Widen Highway 101 in Marin and Sonoma Counties from Hwy 37 in Novato to Old Redwood Highway in Petaluma | $12,000 |
| Widen I-238 between I-580 and I-880 in Alameda County | $800 |
| Enhance pedestrian environment and increase safety along Olympic Blvd. between Vermont and Western Avenues, Los Angeles. | $1,600 |
| Construct landscape medians along Skyline Drive from Sears Avenue to 58th Street, San Diego. | $800 |
| Reconstruct Interstate 880- Route 92 interchange in Hayward. | $1,400 |
| Upgrade essential road arterials, connectors, bridges and other road infrastructure improvements in the Town of Desert Hot Springs, CA. | $1,600 |
| Improvements to Ben Maddox Way Bridge | $1,600 |
| Widen Atlantic Bl bridge over the Los Angeles River in Vernon. | $800 |
| Widen Bundy Drive between Wilshire and Santa Monica Boulevards in the City of Los Angeles. | $3,400 |
| Widen Maine Avenue in Baldwin Park | $300 |
| Construct traffic intersection island improvements on North side of Olympic Blvd. where Irolo St. and Normandie Ave. split in Koreatown, Los Angeles. | $200 |
| Replace twin 2 lane bridge with single 4 lane bridge on SR 138 over Big Rock Wash | $400 |
| State Route 86S and Ave. 50 highway safety grade separation | $800 |
| Widen I-5 to 10 Lanes and Improve Corridor Arterials, SR 91 to I-710. | $4,160 |
| Install traffic signal on Balboa Blvd. at Knollwood Shopping Center. | $96 |
| Replace South Access to the Golden Gate Bridge--Doyle Drive. | $8,000 |
| Gale Avenue widening between Fullerton Road and Nogales Street, and Nogales Street widening at Gale Avenue. | $80 |
| Grade Separation at Cesar Chavez Parkway and Harbor Drive, San Diego | $400 |
| Construct Cabot-Camino Capistrano Bridge Project and related roadway improvements in Cities of Mission Viejo and Laguna Niguel, California | $671 |
| Widen Peyton Drive from Grand Ave. to Chino Hills Pky., construct Eucalyptus Ave. from Peyton Drive to Galloping Hills, improve English Channel. | $5,629 |
| Construction of a traffic signal at the intersection of Hamlin St. and Corbin Ave. | $100 |
| Port of Hueneme Intermodal Access Improvement Project, including grade separation at Rice Avenue and State Route 34; widen Hueneme Road | $3,760 |
| Reconstruct and deep-lift asphalt on various roads throughout the district in Ventura County | $4,800 |
| Forest Highway 171 Upper Skyway Improvement | $5,800 |
| Construct crosswalk bump- outs and related streetscape improvements on Temple St. between Hoover St. and Glendale Blvd., Los Angeles | $400 |
| Construct truck lane from Britannia Blvd. to the Otay Mesa Port of Entry, San Diego County | $1,200 |
| Purchase of Rosemead Blvd. ROW, Temple City | $800 |
| Hwy 199 Narrow Enhancement to reduce active slides that cause significant road closures on primary connecting route from U.S. 101 to I-5 | $1,800 |
| San Gabriel Blvd. and Mission Road Intersection Improvements, San Gabriel. | $160 |
| Construct the Los Angeles River bicycle and pedestrian path in the San Fernando Valley. | $460 |
| Construct Route 101 bicycle/ pedestrian overpass at Millbrae Ave. for the San Francisco Bay Trail. | $1,000 |
| Conduct necessary planning and engineering and implement comprehensive Corridor Management Plan for Arroyo Seco Historic Parkway, Los Angeles | $1,120 |
| State Route 76 Road Widening, Melrose Drive to Interstate 15. | $4,000 |
| SR 52 East Improvements (San Diego). | $6,000 |
| Construct bypass along Hwy 101 around Willits, CA to reduce congestion, improve air quality and enhance economic lifeline of No. Coast. | $5,600 |
| Engineering support to I-5 Joint Powers Authority to widen I-5 freeway and improve corridor arterials from I-710 to Orange County line. | $120 |
| Hazel Avenue Improvements, U.S. Highway 50 to Madison Avenue | $2,400 |
| Design and construct access improvements in North Central Business District, Sacramento | $6,400 |
| Establish I-15 Interchange at Nisqualli and Mojave River crossing in San Bernardino County. | $1,200 |
| San Gabriel Blvd. Rehabilitation Project-- Broadway to Las Tunas, San Gabriel. | $160 |
| Signal upgrades on Avenida de las Flores, Melinda Road, Avenida de las Banderas, and Alma Aldea, Rancho Santa Margarita, California | $100 |
| Construct State Route 905 to connect the Otay Mesa Port of Entry to Interstate 805, San Diego. | $12,000 |
| Rosecrans Avenue and Bridge Arterial Reconstruction Project, Compton | $3,200 |
| Conduct study and construct Daggett Road, Port of Stockton, CA, Access Project. | $7,200 |
| Construct grade separation on State Street and Cajon Boulevard along BNSF tracks in San Bernardino | $1,600 |
| Implement streetscape improvements along Wilbur Avenue to enhance traffic and pedestrian safety. | $80 |
| Provide landscape enhancement of an existing open culvert on Atherton Street, Long Beach | $1,200 |
| Crenshaw Blvd. Rehabilitation, Maricopa St. to Sepulveda Blvd., City of Torrance | $800 |
| Improve pedestrian and biking trails within East Bay Regional Park District, Contra Costa County | $800 |
| Realign SR 4 within the City of Oakley | $1,600 |
| Construct off ramp at Interstate 8/Imperial Avenue Interchange, El Centro | $2,400 |
| Construct Bristol Street multimodal corridor in Santa Ana. | $2,800 |
| Construct pedestrian sidewalk enhancements in Bellflower | $400 |
| I-110/SR 47/Harbor Blvd. Interchange Improvements, San Pedro. | $4,000 |
| Improvement of intersection at Inglewood Ave. and Marine Ave. to reduce congestion, City of Lawndale | $2,600 |
| Construct 213th Street pedestrian bridge to provide safe passage for pedestrians and wheelchairs, Carson. | $800 |
| Construction of Lenwood Road Grade Separation in Barstow, CA. | $1,200 |
| Modifies 9 traffic signals between Willow Road and Middlefield Road and Hamilton Avenue, Menlo Park | $240 |
| Develop conceptual master plan to improve the efficiency of transportation facilities, Covina | $172 |
| Diamond Bar, CA Grand Avenue Rehabilitation. | $1,280 |
| Valley Boulevard Capacity Improvement between 710 Freeway and Marguerita Avenue, Alhambra | $1,600 |
| Valley View/Stage Grade Separation Project, La Mirada and Santa Fe Springs, California. | $720 |
| Conducts environmental review of proposed improvements related to the connection of Dumbarton Bridge to Highway 101. | $400 |
| Construct parking facility and improve access to Imperial Valley Expo | $302 |
| Develop bicycle paths and pedestrian access to Third Avenue, Chula Vista. | $240 |
| Widen and Reconfigure Sepulveda and Culver Boulevards, Culver City. | $2,192 |
| Olsen Road widening and roadway improvements in Simi Valley, California. | $1,680 |
| Widen and reconstruct Washington Blvd. from westerly city boundary at Vernon to I-5 Fwy at Telegraph Rd. in Commerce. | $2,400 |
| San Diego, CA Interstate 5, Sorrento Valley Road and Genesee Avenue Interchange Project. | $1,600 |
| Develop bicycle paths and public park space adjacent to the New River, Calexico | $4,000 |
| Construct Cypress Avenue over-pass to separate Interstate 10 and Union Pacific Railroad tracks in Fontana. | $2,400 |
| Modify and reconfigure Kanan Road interchange along U.S. 101 in Agoura Hills. | $4,000 |
| Completion of Interstate 5 and Interstate 8 Connectors, San Diego. | $4,800 |
| Reconstruct Rosecrans Ave. and construct bus pads from Garfield Ave. to Century Blvd. in Paramount | $320 |
| Improvements/Widening of SR 99 from Goshen to Kingsburg in Tulare County, California | $6,560 |
| Design and implement Harbor Boulevard ITS in Garden Grove. | $800 |
| Improve Access Road to Beale Air Force Base (Smartville Road). | $3,000 |
| Interstate 215, Los Alamos Road Interchange Project | $1,600 |
| Citywide traffic signal upgrades requiring the installation of hardware and software at 9 major intersections, Palo Alto | $400 |
| Rehabilitate street surface of Addison St. between Kester Ave. and Lemona Ave | $38 |
| Construct grade separations at Washington Ave. and UPRR crossing east and Washington Ave. and La Cadena Drive in Colton | $400 |
| SR 91 I-605 Needs Assessment Study, Whittier, CA | $13 |
| Construct parking facility and improve museum pedestrian access from trolley station, San Diego | $800 |
| Construction of a traffic signal at the intersection of Oso Ave. and Vanowen St | $100 |
| Widen and realign Cherry Avenue from 19th Street to one block south of Pacific Coast Highway, Signal Hill | $3,200 |
| Interstate 5 and State Route 78 Interchange Improvements | $4,000 |
| Highway 74 and Interstate 215 Interchange Project. | $800 |
| Upgrade Jepson Parkway at North and South Gates of Travis Air Force Base and widen Vanden Road segment, Solano County. | $3,200 |
| Construction and enhancements of trails in the Santa Monica Mountains National Recreation Area | $800 |
| Reconstruct Atlantic Ave. and improve drainage from Ardmore St. to Imperial Hwy in South Gate. | $2,600 |
| Implement SFgo Van Ness Corridor Improvements. | $5,600 |
| Implement Northwest San Fernando Valley Road and Safety Improvements. | $2,445 |
| Construct Western Placerville Interchanges on State Route 50. | $2,400 |
| Improve West Adams Blvd. Streetscape in West Adams Historic District, Los Angeles. | $200 |
| Improve access from I-8 and construct parking lot for the Imperial Sand Dunes Recreation Area Visitor's Center, Imperial Valley. | $800 |
| Walnut Grove at Broadway Intersection Capacity Enhancements, San Gabriel. | $200 |
| Improvement of Main Street-- Shenandoah Road/SR 49 Intersection, Plymouth | $800 |
| Restoration of Victoria Avenue in the City of Riverside, CA. | $400 |
| Study and construct highway alternatives between Orange and Riverside Counties, directed by the Riverside Orange Corridor Authority working with local government agencies, local transp. authorities, and guided by the current MIS | $12,600 |
| Pedestrian Beach Trail in San Clemente, CA | $800 |
| Hazel Avenue ITS Improvements, Folsom Blvd. to Placer County | $400 |
| Auburn Boulevard Improvements, City of Citrus Heights | $400 |
| Expand Diesel Emission Reduction Program of Gateway Cities COG | $2,480 |
| Sacramento County, California--Watt Avenue Multimodal Mobility Improvements, Kiefer Boulevard to Fair Oaks Boulevard. | $3,200 |
| Construct traffic circle in San Ysidro at the intersection of Via de San Ysidro and West San Ysidro Boulevard, San Diego | $240 |
| Construct and resurface unimproved roads in the Children's Village Ranch and improve access from Children's Village Ranch to Lake Morena Drive, San Diego County | $800 |
| Project design and environmental assessment of widening and improving the interchange at ``H'' Street and I-5, Chula Vista, Chula Vista | $2,160 |
| Construction at I-580 and California SR 84 (Isabel Avenue) Interchange. | $2,000 |
| Acquisition of land along CA 86 at the Desert Cahuilla Prehistoric Site, Imperial County for environmental mitigation related to reducing wildlife mortality while maintaining habitat connectivity | $800 |
| Conduct preliminary engineering and design analysis for a dedicated intermodal right-ofway link between San Diego and the proposed Regional International Airport in Imperial Valley including a feasibility study | $800 |
| Construct Illinois Street Bridge/Amador Street Connection and Improvements, San Francisco. | $3,200 |
| Construct new sidewalks in the City of Heber, CA. | $400 |
| To convert a railroad bridge into a highway bridge spanning over the Feather River between Yuba City and Marysville. | $4,000 |
| Planning design and construction to widen SR in Kern, CA between San Luis Obispo County Line and I-5. | $92,000 |
| Increase Capacity on I-80 between Sacramento/Placer County Line and SR 65. | $21,600 |
| Widen Highway 101 in Marin and Sonoma Counties from Hwy 37 in Novato to Old Redwood Highway in Petaluma | $15,000 |
| Construct Hwy 101 bicycle- pedestrian project in Marin and Sonoma Counties from north of Atherton Ave. to south of Petaluma River bridge | $500 |
| ITS and Intersection Improvements, LAX. | $1,000 |
| Complete Monterey Bay Sanctuary Scenic Trail between Monterey and Santa Cruz counties. | $1,000 |
| Airport Boulevard Interchange Improvements, Salinas and Vicinity, Monterey County. | $4,000 |
| Improvements to Bay Road and Northern Access (City of East Palo Alto) | $6,000 |
| Compton Arterial Reconstruction and Improvement Program, Compton. | $2,500 |
| University Avenue Overpass: Construction of bicycle and pedestrian lanes--East Palo Alto. | $2,000 |
| Sealing unpaved roads in Calaveras County | $1,000 |
| Mission Boulevard/State Route 71 Interchange-- Corridor Improvements in Pomona | $3,000 |
| Construct Bristol Street multimodal corridor in Santa Ana. | $1,000 |
| Reconstruct I-710 Interchanges at I-405, at SR 91, and at I-105. | $5,500 |
| Riverside Highway Grade Separation | $5,000 |
| Hunts Lane Rail Grade Separation, San Bernardino | $5,000 |
| Construct truck lane from Britannia Blvd. to the Otay Mesa Port of Entry, San Diego County | $3,000 |
| Park Boulevard-Harbor Drive Rail Grade Separation, San Diego. | $2,000 |
| Virginia Corridor Rails to Trails: Reconstruct Union Pacific Right-of-Way to bicycle and pedestrian trail, City of Modesto, Stanislaus County. | $3,000 |
| Construct bicycle and pedestrian trail between Port Costa and Martinez as part of the San Francisco Bay Trail, Contra Costa County | $1,000 |
| Improve air quality in the Sacramento region, Sacramento Area Council of Governments. | $5,000 |
| Builds a pedestrian bridge from Hiller Street to the Bay Trail, Belmont | $1,000 |
| Plan and improve Orange County's transportation system to reduce congestion, Orange County Council of Governments | $1,000 |
| Construct 20 mile managed lanes on Interstate 15 between State Route 163 and State Route 78 (San Diego) | $5,000 |
| Design and construct access improvements in North Central Business District, Sacramento | $2,000 |
| Modify I-880 and Stevens Creek Boulevard Interchange to ease traffic congestion in San Jose | $3,000 |
| Construction of Cross Valley Connector between I- 5 and SR 14. | $5,000 |
| I-680: Construct High Occupancy Toll Lanes in Alameda County | $2,000 |
| Interchange Improvements: Laval and I-5, City of Lebec. | $4,000 |
| Planning, design, engineering, and construction of Naval Air Station, North Island access tunnel on SR 75-282 corridor, San Diego. | $5,000 |
| ITS Improvements--City of Pasadena | $2,000 |
| Construct Interchange at Harbor Blvd. and I-80 in West Sacramento. | $1,000 |
| Road and signage improvements, Southeast corner of Tahquitz Canyon Way and Hermosa Drive, Agua Caliente Museum, Palm Springs. | $500 |
| To improve California Avenue between Willow and Spring Streets, Long Beach | $1,000 |
| For Environmental Review Process at I-5 Interchanges, Stockton, North Grove, Eight Mile Road, Otto Drive, and Hammer Lane. | $500 |
| Folsom Boulevard Corridor Transportation Enhancements, between Rod Beaudry Drive and Sunrise Boulevard, City of Rancho Cordova. | $1,000 |
| Construct I-80 HOV lanes and interchange in Vallejo | $2,000 |
| Alameda Corridor SR 47 Port Access Expressway design | $2,000 |
| Rehabilitation, repair and/ or reconstruction of deficient 2-lane roads that connect to Interstate 5, SR 180, SR 41 and SR 99 countywide, Fresno County. | $1,500 |
| Improvement of intersection at Aviation Blvd. and Rosecrans Ave. to reduce congestion (El Segundo). | $2,000 |
| Improvements/Widening of SR 99 from Goshen to Kingsbury in Tulare County, California | $8,000 |
| Modesto, Riverbank and Oakdale, CA Improve SR 219 to 4 lanes | $4,000 |
| Improvements of State Route 4 in Calaveras County between Stockton and Angels Camp. | $1,000 |
| Expansion of Kelseyville/ Lower Lake Expressway in Lake County. | $5,000 |
| Widening of State Route 156 in Monterey between Castroville and U.S. 101 | $5,000 |
| Planning, design, and preliminary engineering of on/off ramp system at intersection of I-10 and Robertson/National Boulevards in Culver City. | $2,000 |
| Construct eastern loop of Campus Parkway in Merced | $2,000 |
| Diesel Emission Reduction Program of South Coast Air Quality Management District | $2,000 |
| Replace South Access to the Golden Gate Bridge--Doyle Drive. | $6,000 |
| Century Boulevard Pedestrian Safety and Transportation Improvements in City of Inglewood | $3,000 |
| Hilmar/Turlock California Highway 99 Interchange Engineering and Construction in Merced County | $1,000 |
| Port of Hueneme Intermodal Access Improvement Access Improvement Project, including grade separation at Rice Avenue and State Route 34; widen Hueneme Road | $1,000 |
| Widen Northbound I-405 between I-10 and U.S. 101 for HOV Lane | $30,000 |
| Alameda Corridor East Construction Authority | $30,000 |
| Construction at Lammers Road and I-205 | $5,000 |
| Feasibility study for constructing SR 130 Realignment project connecting the central valley and San Joaquin County and Santa Clara county | $6,000 |
| Construction of and improvements to State Route 239 from State Route 4 in Brentwood area to I-205 in the area of Tracy | $10,000 |
| Design and construction of Camino Tassajara Crown Canyon to East Town Project | $5,000 |
| Engineering right-of-way and construction of I-580 in the Livermore Valley | $6,000 |
| Bakersfield Beltway System | $140,000 |
| Roadway improvements in and around the former Norton Air Force Base as part of the Inland Empire Goods Movement Gateway project | $55,000 |
| Alameda Corridor East | $125,000 |
| Transbay Terminal | $27,000 |
| Gerald Desmond/I-710 Gateway Project | $100,000 |
| Sacramento Intermodal Station | $3,000 |
| Centennial Corridor Loop in Bakersfield | $330,000 |
| Design, Planning and Construction of State Route 178 in Bakersfield | $100,000 |
| Widening of Rosedale Highway between SR 43 and SR 99 in Bakersfield and widening of SR 178 between SR 99 and D street in Bakersfield | $60,000 |
| Increase capacity on I-80 between Sacrament/Placer County Line and SR 65 | $50,000 |
| I-405 HOV lane | $100,000 |
| State Route 4 East Upgrade | $20,000 |
| Regional Transit Training Consortium Pilot Program - Southern CA Regional Transit Training Consortium | $1,480 |
| Center for Transit Oriented Development | $4,000 |
| "Alameda County, CA AC Transit Bus Rapid Transit Corridor Project " | $418 |
| "Alameda County, CA AC Transit Bus Rapid Transit Corridor Project " | $418 |
| "Martinez, CA Inter-modal Facility Restoration" | $1,254 |
| "Los Angeles, CA Crenshaw Bus Rapid Transit " | $7,129 |
| "San Francisco, CA Implement ITS on Muni Transit System" | $2,508 |
| "San Francisco, CA Redesign and renovate intermodal facility at Glen Park Community " | $3,449 |
| "Solana Beach, CA-Construct Intermodal Facility " | $1,254 |
| "Amador County, California-Regional Transit Center " | $836 |
| "Baldwin Park, CA Construct vehicle and bicycle parking lot and pedestrian rest area at transit center" | $1,672 |
| "Berkeley, CA Construct Ed Roberts Campus Intermodal Transit Diability Center" | $2,508 |
| "Burbank, CA CNG Transit Vehicles Purchase for Local Transit Network Expansion " | $376 |
| "Burbank, CA Construction of Empire Area Transit Center near Burbank Airport " | $209 |
| "Calexico, CA Purchase new buses for the Calexico Transit System " | $251 |
| "Carson, CA Purchase one bus" | $209 |
| "Carson, CA Purchase one trolley-bus vehicle " | $209 |
| "Carson, CA Purchase two transfer facility" | $418 |
| "City of Livermore, CA Construct Bus Facility for Livermore Amador Valley Transit Authority " | $1,881 |
| "Covina, El Monte, Baldwin Park, Upland, CA Parking and Electronic Signage Improvements" | $1,463 |
| "Culver City, CA Purchase compressed natural gas buses and expand natural gas fueling facility" | $3,093 |
| "Davis, CA Davis Multi-Modal Station to improve entrance to Amtrak Depot and parking lot, provide additional parking and improve service" | $836 |
| "Development of Gold Country Stage Transit Transfer Center, Nevada County, CA" | $778 |
| "Fresno, CA-Develop program of low-emission transit vehicles " | $836 |
| "Gardena, CA Purchase of alternative fuel buses for service expansion, on-board security system and bus facility training equipment " | $5,125 |
| "Glendale, CA Construction of Downtown Streetcar Project " | $836 |
| "Glendale, CA Purchase of CNG Buses for Glendale Beeline Transit System " | $386 |
| "Hercules, CA Inter-modal Rail Station Improvements " | $1,254 |
| "Long Beach, Ca Museum of Latin American Art, Long Beach, to build intermodal park and ride facility " | $1,672 |
| "Long Beach, CA Park and Ride Facility " | $836 |
| "Long Beach, CA Purchase one larger (75. passengers) and two smaller (40 passengers) ferryboats and construct related dock work to facilitate the use and accessibility of the ferryboats" | $2,508 |
| "Long Beach, CA Purchase ten clean fuel buses " | $2,508 |
| "Los Angeles County Metropolitan Transit Authority, CA capital funds for facility improvements to support the Cal State Northridge tran system " | $272 |
| "Los Angeles, CA Design and construct improved transit and pedestrian linkages between Los Angeles Community College and nearby MTA rail stop and bus lines " | $1,254 |
| "Los Angeles, CA Improve safety, mobility and access between LATTC, Metro line and nearby bus stops on Grand Ave between Washington and 23rd " | $418 |
| "Los Angeles, CA Improve transit shelters, sidewalks lighting and landscaping around Cedar's-Sinai Medical Center " | $1,254 |
| "Los Angeles, CA Install permanent irrigation system and enchanced landscaping on San Fernando Valley rapid bus transitway " | $2,508 |
| "Los Angeles, CA Wilshire-Vermont subway station reconstruction " | $836 |
| "Los Angeles, CA, Consturction of Intermodal Transit Center at California State University Los Angeles" | $660 |
| "Los Angeles, CA, Fly-Away Bus System Expansion " | $2,500 |
| "Los Angeles, CA, LAX Intermodal Transportation Center Rail and Bus System Expansion " | $2,500 |
| "Mariposa, CA-Yosemite National Park CNG-Hydrogen transit buses and facilities " | $2,090 |
| "Metro Gold Line Foothill Extension Light Rail Transit Project from Pasadena, CA to Montclair, CA" | $12,540 |
| "Monrovia, California-Transit Village Project" | $2,508 |
| "Montebello, CA Bus Lines Bus Fleet Replacement Project " | $585 |
| "Monterey Park, CA Catch Basins at Transit Stop Installation " | $268 |
| "Monterey, CA Purchase bus equipment " | $836 |
| "Montery Park, CA Safety improvements at a bus stop including creation of bus loading areas and street improvements" | $1,338 |
| "Norwalk, CA Transit System Bus Procurement and Los Angeles World Airport Remote Fly-Away Facility Project" | $669 |
| "Oakland, CA Construct streetscape & intermodal improvements at BART Station Transit Villages " | $836 |
| "Ontario, CA Constuct Omnitrans Transcenter " | $836 |
| "Orange County Transit Authority, California-Security surveillance and monitoring equipment" | $4,422 |
| "Orange County, CA Purchase buses for rapid transit " | $836 |
| "Orange County, CA Transportation Projects to Encourage Use of Transit to Reduce Congestion " | $836 |
| "Palm Springs, California-Sunline Transit bus purchase" | $418 |
| "Palm Springs, California-Sunline Transit: CalStrat-Weststart fuel cell bus program" | $836 |
| "Pasadena, CA ITS Improvements " | $836 |
| "Pleasant Hill, CA Contruct Diablo Valley College Bus Transit Center" | $1,254 |
| "Redondo Beach, CA Capital Equipment procurement of 12. Compressed Natural Gas (CNG) Transit Vehicles for Coastal Shuttle Services by Beach Cities Transit" | $669 |
| "Riverside, California-RTA Advanded Traveler Information System " | $418 |
| "Sacramento, CA Bus enhancement and improvements-construct maintenance facility and purchase clean-fuel buses to improve transit service " | $1,672 |
| "Sacramento, CA Construct intermodal station and related improvements" | $5,852 |
| "San Diego, CA Completion of San Diego Joint Transportation Operations Center (JTOC)" | $1,672 |
| "San Diego, CA Widen sidewalks and bus stop entrance, and provide diagonal parking, in the Skyline Paradise Hills neighborhood (Reo Drive)" | $251 |
| "San Fernando Valley, CA Reseda Blvd. Bus Rapid Transit Route " | $502 |
| "San Fernando, CA Purchase CNG buses and related equipment and construct facilities " | $2,541 |
| "San Francisco, CA Construct San Franciso Muni Islais Creek Maintenance Facility " | $5,016 |
| "San Gabriel alley, CA-Foothill Transit Park and Rides " | $7,942 |
| "San Joaquin, California Regional Rail-Altamont Commuter Express Corridor inter-modal centers" | $3,344 |
| "San Luis Ray, California-Transit Center Project " | $418 |
| "Santa Ana, CA Improve Santa Ana transit terminal" | $836 |
| "Santa Barbara, CA-Expansion of Regional Intermodal Transit Center " | $251 |
| "Santa Monica, CA Construct intermodal park-and-ride facility at Santa Monica College campus on South Bundy Drive near Airport Avenue " | $836 |
| "Santa Monica, CA Purchase and service LNG buses for Santa Monica's Big Blue Bus to meet increased ridership needs and reduce emissions " | $3,135 |
| "South Pasadena, CA Silent Night Grade Crossing Project " | $752 |
| "South San Francisco, CA Construction of Ferry Terminal at Oyster Point in South San Francisco to the Sa Francisco Bay Water Transit Authority " | $3,971 |
| "Sylmar, CA Los Angeles Mission College Transit Center construction " | $209 |
| "Temecula, California-Intermodal Transit Facility " | $418 |
| "Torrance Transit System, CA Acquistion of EPA and CARB-certified low emission replacement buses " | $2,508 |
| "Union City, CA Inter-modal Station, Phase 1: Modify BART station" | $3,553 |
| "Woodland Hills, CA Los Angeles Pierce College Bus Rapid Transit Station Extension " | $836 |
| "Needles, California-El Garces Intermodal Facility" | $1,672 |
| "San Bernardino, CA Implement Santa Fe Depot improvements in San Bernardino" | $418 |
| "East San Diego County, California-Bus Maintenance Facility Expansion" | $1,672 |
| "Escondido, CA-Construct Bus Maintenance Facility" | $418 |
| "City of Alameda, CA Plan, design, and construct intermodal facility" | $1,672 |
| "Emeryville, CA Expand & Improve Inter-modal Transit Center at Amtrak Station " | $836 |
| "Oakland, CA Construct Bay Trail between Coliseum BART station and Martin Luther King, Jr. Regional Shoreline" | $752 |
| "Richmond, CA BART Parking Structure " | $4,180 |
| "San Joaquin Region Transit District, California, Hybrid Diesel-Electric Replacement Buses " | $1,050 |
| "Sonoma County, CA Purchase of CNG buses" | $418 |
| "Mammoth Lakes, California-Regional Transit Maintenance Facility " | $418 |
| "San Francisco, CA Implement Transbay Terminal-Caltrain Downtown Extension Project" | $11,704 |
| Transbay Terminal/ Caltrain Downtown Extension Project | $17,500 |
| "Woodland, CA Yolobus operations, maintenance, administration facility expansion and improvements to increase bus service with alternative fuel buses" | $1,672 |
| National Writing Project | $20,336 |